BUILDING PREPARATIONS SWIMMING POOL ENCLOSURES LNE / REVIZE: AFNOR NF P NF P NF P TESTED BY LNE

Podobné dokumenty
STAVEBNÍ PŘÍPRAVA ZASTŘEŠENÍ BAZÉNŮ

BAUVORBEREITUNG ÜBERDACHUNG

BAUVORBEREITUNG ÜBERDACHUNG

stavební příprava zastřešení bazénů

PC/104, PC/104-Plus. 196 ept GmbH I Tel. +49 (0) / I Fax +49 (0) / I I

STAVEBNÍ PŘÍPRAVA ZASTŘEŠENÍ NA ZEĎ 2016 REVIZE: TESTED BY LNE AFNOR NF P90-309

STAVEBNÍ PŘÍPRAVA ZASTŘEŠENÍ BAZÉNŮ 2016 REVIZE: TESTED BY LNE AFNOR NF P90-309

CENÍK Kancelářské stoly NEW EASY (k cenám se připočítává 21 % DPH) platný od

Together H A N D B O O K

EXTERNAL BLINDS. Accesories

GENERAL INFORMATION RUČNÍ POHON MANUAL DRIVE MECHANISM

EXACT DS OFFICE. The best lens for office work

STAVEBNÍ PŘÍPRAVA ZASTŘEŠENÍ SKYTRIUM MIA, RIO 2016 REVIZE: TESTED BY LNE AFNOR NF P90-309

The tension belt serves as a tension unit. After emptying the belt is cleaned with a scraper.

Gymnázium, Brno, Slovanské nám. 7 WORKBOOK. Mathematics. Teacher: Student:

for your fingerboard and for your fingers

TKGA3. Pera a klíny. Projekt "Podpora výuky v cizích jazycích na SPŠT"

filtrační polomasky disposable respirators

PROFILY DO SÁDROKARTONU ARCHITECTURAL LED FIXTURES

TECHNICKÝ LIST řada mechanických odvaděčů kondenzátu AUTODRAIN TECHNICAL DATA SHEET for mechanical autodrain equipment AUTODRAIN

Samas Česká republika spol. s r. o Krouna 322 T F

LOGOMANUÁL / LOGOMANUAL

Entrance test from mathematics for PhD (with answers)

GUIDELINES FOR CONNECTION TO FTP SERVER TO TRANSFER PRINTING DATA

Postup objednávky Microsoft Action Pack Subscription

pánská peněženka / men s wallet size: 13,5 x 11 cm pánská peněženka / men s wallet size: 15 x 9,5 cm

TECHNICKÝ LIST řada STANDARD, HP, FZ TECHNICAL DATA SHEET for STANDARD, HP, FZ 2018 v1.0

CASTING HAND PRODUCTION USING MOULDS

Executive office furniture system LINEART. Systém manažerského nábytku LINEART

ROLZ-2. Portable AV/Conference Center. Assembly Instructions

Dveřní rám Palermo Glass door frame PALERMO

Nuova BYTOVÉ ROZVODNICE NUOVA IP40 DOMESTIC ENCLOSURES NUOVA IP40

PROHLÁŠENÍ O VLASTNOSTECH

Friction drives have constant or variable drives (it means variators). Friction drives are used for the transfer of smaller outputs.

SEMI-PRODUCTS. 2. The basic classification of semi-products is: standardized semi-products non-standardized semi-products

USER'S MANUAL FAN MOTOR DRIVER FMD-02

folie Swimmingpool Europe aqualiner 75/100 superliner 85/100 alkorplan 2000 pro venkovní i vnitøní bazény for outdoor and indoor pools

TRACK BASES PROFESSIONAL -DATASHEET TRAŤOVÁ PODLOŽÍ PROFESSIONAL -DATOVÝ LIST

B1 MORE THAN THE CITY

StandardLine DIMENSIONED SKETCH ROZMĚROVÁ ŘADA

STAVEBNÍ PŘIPRAVENOST GILOTINA VLO DIMENSIONAL SHEET VLO MASSBLATT VERTIKALER BESCHLAG VLO МОНТАЖ МЕТАЛЛОКОНСТРУКЦИИ ВОРОТ СИСТЕМЫ ГИЛЬОТИНА ВЛО

Transportation Problem

KULOVÝ STEREOTEPLOMĚR NOVÝ přístroj pro měření a hodnocení NEROVNOMĚRNÉ TEPELNÉ ZÁTĚŽE

Lemová a okolní bazénová dlaïba DlaÏby v této nabídce jsou urãeny pro vnitfiní a vnûj í pouïití. Série SAHARA pfiedstavuje nejucelenûj í

The global leader in door opening solutions

2N LiftIP. Voice Alarm Station. Communicator for Lifts. Version

Acqua. ROZVODNICE PRO NÁSTĚNNOU MONTÁŽ - Acqua IP65 WALL MOUNTED ENCLOSURES IP65 - Acqua

Element h A N D B o o K

2N Voice Alarm Station

Litosil - application

KOMBINACE KOMOD A / RANGE OF CABINETS A PORTE A1 150 x 45/99,5 cm výška s nízkou nohou 85,5 cm. PORTE A2 150 x 45/99,5 cm. PORTE A3 150 x 45/99,5 cm

DATA SHEET. BC516 PNP Darlington transistor. technický list DISCRETE SEMICONDUCTORS Apr 23. Product specification Supersedes data of 1997 Apr 16

2N LiftIP. IO Extender. Communicator for Lifts. Version

Tento materiál byl vytvořen v rámci projektu Operačního programu Vzdělávání pro konkurenceschopnost.

6225 Dvojitý držák ru ník 600

FLEXIBILNÍ LED PÁSEK SÉRIE DIAMOND II

Examples of prefabricated columnal a) Beams columnal systems (1. transversal, 2. longitudinal, 3. duplex (bilateral) system, 4. transversal system

Angličtina v matematických softwarech 2 Vypracovala: Mgr. Bronislava Kreuzingerová

Fire Control. T 3 - Determining the elements for fire due to of substitute instruments

VYUŽITÍ DATA DRIVEN PAGES

Profily pro skleněné zábradlí Profiles for glass balustrades

ZA HIDRAULIČKE SERVOUPRAVLJAČE

WORKSHEET 1: LINEAR EQUATION 1

Introduction to MS Dynamics NAV

NOVINKY BARTOSINI VIII V VI III 6/2013

nkt instal CYKY 450/750 V Instalační kabely Konstrukce Použití Vlastnosti Installation cables Construction 2 Izolace PVC Měděná plná holá jádra

4Ever H A N D B O O K

User manual SŘHV Online WEB interface for CUSTOMERS June 2017 version 14 VÍTKOVICE STEEL, a.s. vitkovicesteel.com

nkt instal CYKY 450/750 V Instalační kabely Standard PN-KV Konstrukce Použití Vlastnosti Installation cables Construction

Klepnutím lze upravit styl předlohy. nadpisů. nadpisů.

PROHLÁŠENÍ O VLASTNOSTECH

CHAPTER 5 MODIFIED MINKOWSKI FRACTAL ANTENNA

TERNO TERNO DIVA TERNO MULTI. Posuvné systémy Sliding systems

TUNGSTEN CARBIDE BURS TVRDOKOVOVÉ VRTÁČKY

Compression of a Dictionary

Topdvířka Katalog Hliníková dvířka

CNC řízený vrtací a frézovací stroj pro výrobce oken a dveří CNC drilling machine for windows and doors manufacturers

ZB5AV013 bílá signální hlavice Ø22 plná čočka pro integ. LED

STORAGE, TRANSPORTATION, HANDLING MANUAL D0141.STHM.01

1-AYKY. Instalační kabely s Al jádrem. Standard TP-KK-133/01, PNE Konstrukce. Použití. Vlastnosti. Installation cables with Al conductor

UZAVÍRACÍ KLAPKY S DVOJITOU EXCENTRICITOU DOUBLE-ECCENTRIC BUTTERFLY VALVES TYP / TYPE L32.7

SEZNAM PŘÍLOH. Příloha 1 Dotazník Tartu, Estonsko (anglická verze) Příloha 2 Dotazník Praha, ČR (česká verze)... 91

Al A. tu Bu e. g o. Bazénové žebříky Pool ladders Madla Handrails Bazénové žebříky, příslušenství...

MANTOVA. Dveřní bodový systém Pivot door system

telekomunikační kabely / telecommunication cables

ã. z. název kg cena Kã price EUR

MILANO. Posuvný systém Sliding system

Kancelářský systém ICE

Steel Cabinets HANDBOOK

RIMINI. Samozavírací hydraulické závěsy Self-closing hydraulic hinges

2 Izolace PVC. PVC insulation

Náhrady kyčelního kloubu hip replacements

Vánoční sety Christmas sets

Gymnázium, Brno, Slovanské nám. 7 WORKBOOK. Mathematics. Student: Draw: Convex angle Non-convex angle

Relativnost současnosti dvou nesoumístných událostí poprvé (UDÁLOSTI NEJSOU SPOJENY KAUZÁLNĚ)

Czech Republic. EDUCAnet. Střední odborná škola Pardubice, s.r.o.

Aktivita CLIL Chemie III.

BALUSTRADO. Profily pro skleněné zábradlí Profiles for glass balustrades

1, Žáci dostanou 5 klíčových slov a snaží se na jejich základě odhadnout, o čem bude následující cvičení.

Systém skládací - harmonikový Slide & fold system BARI SLF400

Transkript:

UILDING PREPRTIONS SWIMMING POOL ENCLOSURES LNE par 23. tager VERZE: 2. 2017 / REVIZE: 23. 2. 2017 Le progr s, une passion NF P90-309 TESTED Y LNE FNOR certification TESTED Y LNE FNOR FNOR NF P90-309 NF P90-309

1 FRONT VIEW WITH VIEW OF THE CONCRETE STRIPS KEY: - rail spacing for the smallest module - rail spacing for the biggest module E - total length of the enclosed area G - elevated lower border of the front panel from the lower edge of the rail R - extension of the rail behind the enclosed area V - height of the biggest module K - axial distance between the inner and outer rails of one side of the rail, does not specify the actual maximum width of the rail - inner spacing of the concrete strip - outer spacing of the concrete strip K3 - width of the concrete strip V DETIL G 7 cm 11 cm 5 cm K 3 cm RIL IR K RIL XL 2

THE EXCT DIMENSIONS OF THE RILS RE LWYS PRT OF THE SCHEMTIC DRWING LL DIMENSIONS RE GIVEN IN CENTIMETRES. DETIL K IR = 10 XL = 6 IR = 8 XL = 6 RIL SPCING: K3 G 1.3 1.2 1.1 IR RILS: DOULE RILS TRIPLE RILS FOUR RILS FIVE RILS SIX RILS SEVEN RILS RILS XL: DOULE RILS TRIPLE RILS FOUR RILS FIVE RILS SIX RILS SEVEN RILS K = 7 cm K = 14 cm K = 21 cm K = 28 cm K = 35 cm K = 42 cm K = 11 cm K = 22 cm K = 33 cm K = 44 cm K = 55 cm K = 66 cm 1.1 Gravel (grade) 8-16 mm, height of the sub-base min. 10 cm 1.2 Concrete base (concrete strips, concrete slab) Carried out with a concrete base: carried out of gravel backfill (see 1.1) width of the base (concrete strips): K3 = rail width K + 18 cm (valid for IR rails) K3 = rail width K + 12 cm (valid for XL rails) length of the base = length E + R + 10 cm on every side must be used a min. concrete mix type C16/20 S2 (S3) concrete strips min. thickness of 30 cm (we recommend carrying out the strip to a non-freezing depth of 60 cm), concrete slab min. thickness of 15-20 cm reinforced Kari meshing (100 x 100 x 6 mm) or wire (Ø 6 mm) locally reinforced at 1/3 of the height of the slab the base must be clean, smooth, horizontal (flatness under rails +/- 2 mm/2 m) 1.3 Final surface must be firmly attached to the concrete base (foundation) paving is the most suitable variant of final surface - must be firmly attached to the concrete base (it must not be loose sand or gravel) other suitable final surfaces are all solid materials designed for this purpose which are firmly attached to the concrete base 3

K3 FLOOR PLN K3 DRENÁŽNÍ DRINGE ŠCHT SHFT TECHNOLOGICKÁ TECHNOLOGICL ŠCHT OX NEJVYŠŠÍ THE HIGHEST MODUL MODULE E R THE NEJNIŽŠÍ LOWEST MODULE DIRECTION OF MOVEMENT SMĚRŘ POSOUVÁNÍ MODULŮ OF THE MODULES KEY: - rail spacing for the smallest modules - rail spacing for the biggest modules E - total length of enclosure area R - extension of the rail behind the enclosed area 4 - inner spacing of the concrete strip - outer spacing of the concrete strip K3 - width of the concrete strip

2 SU-SE FOR IR RILS 7 cm LL DIMENSIONS RE GIVEN IN CENTIMETRES. 2.1 Rail on the final foundation (paving) 10 K 8 5 cm K 3 cm Finální povrch the musí final být surface pevně must spojen be firmly attached to s betonovým the concrete base podkladem etonová concrete mix směs type typ C16/20 C16/20 S2 (S3) S2(S3) min. a minimum tloušťka thickness 30 cm of pro 30 cm betonový for a concrete pás nebo strip betonová or concrete deska slab min. min. thickness tloušťka of 15-20 - cm 20 cm Podkladová underlay according vrstva to dle the final výrobce surface vybraného the finálního manufacturer povrchu selected Štěrk gravel (grade) o zrnitosti of 8-16 (frakce) mm 8-16 mm, výška height of podsypu the sub-base min. min. 10 cm 10 cm 2.2 Rail on the final foundation (board) max 40 the Finální final surface povrchmust be firmly attached to the underlying musí být pevně beams spojen s podkladovými trámky Podkladové trámky musí the underlying být pevně beams spojeny s betonovým podkladem Orientace must be firmly podkladových attached to the trámků concrete kolmo foundation kolejištěm orientation (ne of supporting podélně!) beams max. perpendicular rozteč 40 cm, to the rails (not lengthwise!), místně max. distance zhuštěná of 40 cm, rozteč local pod concise kolejištěm spacing under na 10-15 the rails cm. at 10-15 cm etonová concrete mix směs type C16/20 typ C16/20 S2 (S3) S2(S3) min. a minimum tloušťka thickness 30 cm of pro 30 cm betonový for a concrete pás nebo strip or concrete betonová slab min. thickness deska min. of 15-20 tloušťka cm 15-20 cm gravel Štěrk (grade) o zrnitosti of 8-16 (frakce) mm 8-16 mm, Rostlý landscaped terén terrain Finální the final povrch surface must be firmly attached to the musí underlying být pevně beams spojen s podkladovými trámky 10 K 8 the Podkladové underlying trámky beams must be firmly attached to musí the concrete být pevně foundation spojeny s betonovým podkladem etonová concrete mix směs type typ C16/20 C16/20 S2 (S3) S2(S3) min. a minimum tloušťka thickness 30 cm of pro 30 cm betonový for a concrete pás nebo strip or concrete betonová slab min. thickness deska of min. 15-20 tloušťka cm 15-20 cm gravel Štěrk (grade) o zrnitosti of 8-16 (frakce) mm 8-16 mm, 5

2.3 Rail embedded in paving (placed on a concrete strip, slab) 2 10 K 8 min 1 min 1 Finální povrch the musí final být surface pevně must spojen be firmly attached to s betonovým the concrete base podkladem underlay Podkladová according vrstva to the dle final výrobce surface vybraného the manufacturer finálního povrchu selected concrete etonová mix směs type C16/20 typ C16/20 S2 (S3) S2(S3) a min. minimum tloušťka thickness 30 cm of pro 30 cm betonový for a concrete pás strip neboor concrete slab betonová min. thickness deska of min. 15-20 tloušťka cm 15-20 cm gravel Štěrk (grade) o zrnitosti of 8-16 (frakce) mm 8-16 mm, 2.4 Rail embedded in a wooden grid Option 1: Lay the final surface after laying the rails (recommended) Option 2: Remove the final surface around the rails Finální the final povrch surface must be firmly attached to the musí underlying být pevně beams spojen s podkladovými trámky Podkladové trámky the musí underlying být pevně beams spojeny s betonovým podkladem must Orientace be firmly podkladových attached to the trámků concrete kolmo foundation kolejištěm orientation of (ne supporting podélně!) beams max. perpendicular rozteč podkladků to the rails 40 (not cm, lengthwise!), max. místně distance zhuštěná of 40 cm, rozteč local pod concise kolejištěm spacing under na 10-15 the rails cm. at 10-15 cm etonová concrete mix směs type typ C16/20 C16/20 S2 (S3) S2(S3) min. a minimum tloušťka thickness 30 cm of pro 30 cm betonový for a concrete pás nebo strip or concrete betonová slab min. thickness deska of min. 15-20 tloušťka cm 15-20 cm max 40 gravel Štěrk (grade) o zrnitosti of 8-16 (frakce) mm 8-16 mm, 2 10 K 8 min 1 min 1 Finální the final povrch surface must be firmly attached to the musí underlying být pevně beams spojen s podkladovými trámky the Podkladové underlying trámky beams must be firmly attached to musí the concrete být pevně foundation spojeny s betonovým podkladem concrete etonová mix směs type typ C16/20 C16/20 S2 (S3) S2(S3) a min. minimum tloušťka thickness 30 cm of pro 30 cm betonový for a concrete pás nebo strip or concrete slab betonová min. thickness deska of min. 15-20 tloušťka cm 15-20 cm gravel Štěrk (grade) o zrnitosti of 8-16 (frakce) mm 8-16 mm, 6

3 SU-SE FOR XL RILS 11 cm LL DIMENSIONS RE GIVEN IN CENTIMETRES 3.1 Rail on the final foundation (paving) 6 K 6 K Finální povrch the musí final být surface pevně must spojen be firmly s attached betonovým the concrete podkladem base concrete etonová mix směs type C16/20 typ C16/20 S2 (S3) S2(S3) a min. minimum tloušťka thickness 30 cm of pro 30 cm betonový for a concrete pás nebo strip or concrete slab betonová min. thickness deska of min. 15-20 tloušťka cm 15-20 cm underlay Podkladová according vrstva to the dle final výrobce surface vybraného the manufacturer finálního povrchu selected gravel Štěrk (grade) o zrnitosti of 8-16 (frakce) mm 8-16 mm, Rostlý landscaped terén terrain 3.2 Rail on the final foundation (board) max 40 Finální the final povrch surface must be firmly attached to the musí underlying být pevně beams spojen s podkladovými trámky Podkladové trámky the musí underlying být pevně beams spojeny s betonovým podkladem must Orientace be firmly podkladových attached to the trámků concrete kolmo foundation kolejištěm orientation of (ne supporting podélně!) beams max. perpendicular rozteč 40 cm, to the rails (not lengthwise!), max. místně distance zhuštěná of 40 cm, rozteč local pod concise kolejištěm spacing under na 10-15 the rails cm. at 10-15 cm etonová concrete mix směs type typ C16/20 C16/20 S2 (S3) S2(S3) min. a minimum tloušťka thickness 30 cm of pro 30 cm betonový for a concrete pás nebo strip or concrete betonová slab min. thickness deska of min. 15-20 tloušťka cm 15-20 cm Štěrk gravel (grade) o zrnitosti of 8-16 (frakce) mm 8-16 mm, výška height of podsypu the sub-base min. min. 10 cm 10 cm Rostlý landscaped terén terrain 6 K 6 the Finální final surface povrchmust be firmly attached to the underlying musí být pevně beams spojen s podkladovými trámky the Podkladové underlying trámky beams must be firmly attached to musí the concrete být pevně foundation spojeny s betonovým podkladem etonová concrete mix směs type typ C16/20 C16/20 S2 (S3) S2(S3) min. a minimum tloušťka thickness 30 cm of pro 30 cm betonový for a concrete pás nebo strip or concrete betonová slab min. thickness deska of min. 15-20 tloušťka cm 15-20 cm Štěrk gravel (grade) o zrnitosti of 8-16 (frakce) mm 8-16 mm, výška height of podsypu the sub-base min. min. 10 cm 10 cm 7

3.3 Rail embedded in paving (placed on a concrete strip, slab) 6 K 6 min 4 min 5 2,5 Finální povrch: the musí final být surface pevně must spojen be firmly attached to s betonovým the concrete podkladem base Podkladová underlay according vrstva to dle the výrobce final surface vybraného the finálního manufacturer povrchu selected concrete etonová mix směs type typ C16/20 C16/20 S2 (S3) S2(S3) a min. minimum tloušťka thickness 30 cm of pro 30 cm betonový for a concrete pás nebo strip or concrete slab betonová min. thickness deska min. of 15-20 tloušťka cm 15-20 cm gravel Štěrk o (grade) zrnitosti of 8-16 (frakce) mm 8-16 mm, 3.4 Embedding XL rails to boards is NOT POSSILE 8

4 SU-SE FOR THE ENTIRE ENCLOSURE make concrete strips for both panel locks concrete strips width of 20 cm and a min. depth of 30 cm - concrete mix type C16/20 S2 (S3) valid for enclosures: with a hinged door in the panel (front or rear) with an enclosure width > 400 cm axis line = outer edge of the enclosure 20 cm 20 cm axis line = outer edge of the enclosure 9

Notes: 10

Notes: 11

Thank you for using LIXON products www.lixon.com export@albixon.com