EKOL, spol. s r.o. Brno Tel.: Křenová 65 Fax: Brno

Podobné dokumenty
REFERENCE LIST - STEAM TURBINES

EKOL, spol. s r.o. Brno Tel.: Křenová 65 Fax: Brno

List of References for Steam Turbines

REFERENČNÍ SEZNAM - PARNÍ TURBÍNY

E.S.I.I.C. Cairo Qous 2

Reference parní turbíny EKOL, spol. s r.o.

EKOL, spol. s r.o. Brno Tel.: Křenová 65 Fax: Brno

Hiang Seng Fibre Container Co.,LTD. ESIIC. SARPI Dąbrowa Górnicza Sp. z o.o. Bukocel, a.s. Hencovce Soda Polska Janikowo. ČEZ, a.s.

Duslo a.s. Plzeňská energetika. Dalkia Kolín, a.s. Technoprojekt Ltd. Rusko MVA Bielefeld Německo Fans, a.s.

EKOL, spol. s r.o. Brno Tel.: Křenová 65 Fax: Brno ekolsro@ekolbrno.cz

LIST OF REFERENCES Servicing steam turbines

Zkušenosti s exportními dodávkami a EPC projekty

MicroSCADA Elektrárny a teplárny

quantity of free allowances proposed value per allowance 25% of total investment total value proposed no of FA in application amount

poř. číslo Název číslo TZ vydání vydání jazyk rok Uložení a dynamika rotoru turboagregátu 4 MW/ /min č 2 Studie

REFERENČNÍ SEZNAM Servis parních turbín

Podpořené projekty Situační prevence. Informace pro občany

Siemens, s.r.o., branch Industrial Turbomachinery Prezentace odštěpného závodu

Příloha č. 1- Hustota zalidnění ČR 1. Přílohy: 44

EKOL, spol. s r. o. Obsah

Na Pankráci 53 a Praha 4 Czech Republic. p-s@volny.cz

Přehled o počtu OSVČ

Přehled o počtu OSVČ

Přehled o počtu OSVČ

Přehled o počtu OSVČ

Přehled o počtu OSVČ

Přehled o počtu OSVČ

Přehled o počtu OSVČ

Přehled o počtu OSVČ

Přehled o počtu OSVČ

references HSF System a. s.

Prosinec 2012 PŘECHODNÝ NÁRODNÍ PLÁN ČESKÉ REPUBLIKY

ROZHODNUTÍ KOMISE. ze dne

NEE Process Solutions - Reference

Příloha 7a Prognózy - struktura 2G minuty (tisíce)

5-1b. PRŮMĚRNÉ KUPNÍ CENY STAVEBNÍCH POZEMKŮ V ČR DLE OKRESŮ A VELIKOSTI OBCÍ V LETECH (v Kč/m 2 ) - POŘADÍ

5-1b. PRŮMĚRNÉ KUPNÍ CENY STAVEBNÍCH POZEMKŮ V ČR DLE OKRESŮ A VELIKOSTI OBCÍ V LETECH (v Kč/m 2 ) - POŘADÍ

5-1b. PRŮMĚRNÉ KUPNÍ CENY STAVEBNÍCH POZEMKŮ V ČR DLE OKRESŮ A VELIKOSTI OBCÍ V LETECH (v Kč/m 2 ) - POŘADÍ

5-1a. PRŮMĚRNÉ KUPNÍ CENY STAVEBNÍCH POZEMKŮ V ČR DLE OKRESŮ A VELIKOSTI OBCÍ V LETECH (v Kč/m 2 )

5-1a. PRŮMĚRNÉ KUPNÍ CENY STAVEBNÍCH POZEMKŮ V ČR DLE OKRESŮ A VELIKOSTI OBCÍ V LETECH (v Kč/m 2 )

All what you need ABOUT Energy in the Czech Republic...

Ministerstvo životního prostredí

PŘÍLOHY. Příloha č. 1: Systematizace regionálních plnomocníků HSTD k 1. prosinci Středočeský kraj

Seznam stanic systému ČD Kurýr a InterKurýr

Seznam stanic systému ČD Kurýr a InterKurýr

HPI CZ, spol. s r.o. ITEMA s.r.o. HPI - CZ spol. s r.o. HPI - CZ spol. s r.o., pobočka Plzeň BRNO OLOMOUC VESELÍ NAD MORAVOU. Obchodní zástupci HPI-CZ

Města, ve kterých vyzvedneme zásilky v den objednání přepravy

CENTRAL GOVERNMENT AUTHORITIES 1

PŘECHODNÝ NÁRODNÍ PLÁN ČESKÉ REPUBLIKY

V play-off na tři vítězství je 1., 2. a 5. utkání hráno doma. V play-off na dvě vítězství je první utkání hráno doma.

POČET VOZIDEL S NEDOKONČENOU REGISTRACÍ K 8. ČERVNU 2015 Kraj Okres Registrační místo Počet vozidel s NR Hlavní město Praha Hlavní město Praha PRAHA

Příloha č. 8, str. 1 Organizačního řádu

SANITÁRNÍ KERAMIKA. Concept 100. Flexibilní vzhled koupelny

Příloha 24. Výpis podílu emisních zdrojů nebo skupin emisních zdrojů na průměrné roční koncentraci NO x v roce 2001 ve vybraných referenčních bodech

Rozdělení území okresů do správních obvodů ORP

Výnosy z kmenových včelstev v kg Sektor Počet Počet včelstev. k 1.5. k a ,62 0, ,0 7,00 Ostatní 11,67

Příloha k č. j. 2013/33749

Návštěvnost Kraje Vysočina s využitím zbytkových dat mobilních operátorů

Pořadí v oblasti podnikatelské prostředí na základě 25 kritérií (50 % hodnocení)

Žádosti o registrační značky na přání podle obcí s rozšířenou působností

Celorepublikové vyhodnocení Města pro byznys České republiky 2011

Hiang Seng Fibre Container Co.,LTD. ESIIC. SARPI Dąbrowa Górnicza Sp. z o.o. Bukocel, a.s. Hencovce. Soda Polska Janikowo. ČEZ, a.s.

Retrospektivní přehled o počtu obyvatel a domů v letech v krajích a správních obvodech obcí s rozšířenou působností

Název finančního úřadu Název finančního úřadu Sídlo finančního úřadu Finanční úřad pro Prahu 1 Finanční úřad pro hlavní město Prahu

Referenční práce JOBI ENERGO - projekty REFERENČNÍ PRÁCE. JOBI ENERGO s.r.o. Projektové dokumentace investičních akcí. Strana 1

Vstupní. Garantované. Danzer Bohemia Dýhárna s.r.o. CZ - Dýhárna Mělník kotel na spalování dřevního odpadu, 16 t/h EMO (11% O 2) 2007

Náhrada SZT tepelnými čerpadly ano či ne. Michal Havlíček

Zpráva o hodnocení provozovatelů zařízení ve vztahu k splnění na úrovní EU v roce ,380 8, Informace přístupné veřejnosti

Návštěvnost Kraje Vysočina s využitím zbytkových dat mobilních operátorů

M032 - Zpráva o výsledcích výběrového procesu

1. liga, skupina A - Muži 1. liga, skupina A - Ženy

Provoz pobočky v době vánočních svátků

Rozpis státní finanční podpory pro rok 2016 pro obecní úřady obcí s rozšířenou působností

Přehled zrušených 199 finančních úřadů k a jejich nástupnických 14 krajských finančních úřadů od

Česká správa sociálního zabezpečení (ČSSZ)

Přehled matrik současných FÚ a jejich nástupnických krajských FÚ od

VÝROBCE KVALITNÍ DLAŽBY A STAVEBNÍCH HMOT CENÍK 2019

V kvalifikaci je 1. a 3. utkání hráno doma. Páté utkání je hráno na neutrálním ledě v Ostravě na ZS TJ Vítkovice.

Maloobchod v regionech České republiky František Diviš, Regional Research Project Manager, INCOMA Research

GLOBALIZATION AND SOCIOECONOMIC INEQUALITIES IN SELF-REPORTED HEALTH IN THE CZECH REPUBLIC

GLOBALIZATION AND SOCIOECONOMIC INEQUALITIES IN SELF-REPORTED HEALTH IN THE CZECH REPUBLIC

Příloha 1/A. Podpisy zdrojů Ostravská oblast Střední Čechy a Praha. Technické parametry zdrojů

ŠKOLNÍCH LAVIC. více NÁVRAT DO 119,- 119,- HIT HIT. v plné výbavě! za méně... každý den NABÍDKA PLATÍ VE DNECH MIKINA S KAPUCÍ

COMOS Software Solutions

Úřad práce v Plzni. Zpráva o situaci na trhu práce Plzeňský kraj. Únor 2010

Seznam podpořených projektů Městského programu prevence kriminality na rok 2009

REFERENCE LIST

ALL WHAT YOU NEED ABOUT ENERGY IN THE CZECH REPUBLIC...

Installed power capacity in CR ( )

POPIS ČÍSELNÍKU. Česká republika CZ0100. Praha. Benešov CZ0201. Beroun CZ0202 CZ0203. Kladno. Kolín CZ0204 CZ0205. Kutná Hora.

Tabulky s žebříčky největších znečišťovatelů podle IRZ pro Ústecký kraj (hlášení za rok 2006)

Reference INVELT SERVIS, s.r.o. Číslo

Cíl IPRM. Integrovaný plán rozvoje města. Definice

Evidenční Provozovatel. Evidenční. Provozovatel výroby likvidace. Provozovatel. číslo

IS THERE NECESSARY TO RECALCULATE VLTAVA CASCADE PURPOSES??

sídelních jednotek Počet základních Počet Česká republika

TERMÍNOVÝ KALENDÁŘ SOUTĚŽÍ ČMSHb ročník

Bilance těžby a spotřeby hnědého uhlí v České republice.

Ex1 Praha - Ostrava - Žilina km km ČD, a.s. Vlak Ex 341. Ex Ex Ex 345 Ex 143 Ex Ex 145. Ex

PŘECHODNÝ NÁRODNÍ PLÁN ČESKÉ REPUBLIKY

Transkript:

Page 1 105 104 103 102 101 100 and commissioning of 3,5 MW condensing steam turbine for compressor drive, type specification K3,5-3,14 and commissioning of Biomassa Power Plant inclusive 5,8 MW backpressure steam turbine with generator, type specification R5,8 6,2/0,04-0,12 and commissioning of 9,7 MW condensing P9,7 4,1/0,2 Planning, design, manufacture, and commissioning of 25 MW condensing steam turbine with two controlled extractions, type specification T 25 9,0/0,1 Planning, design, manufacture, and commissioning of 14 MW condensing steam turbine for compressor drive, type specification K14 1,0 and commissioning of 27,5 MW backpressure steam turbine with generator, type specification PR 27,5-7,8/1,4/0,4 99 and commissioning of 7 MW condensing P7,0 3,7/0,2 98 and commissioning of 2,9 MW condensing T2,9-3,15/0,12 97 and commissioning of 5,4 MW condensing P5,4-2,9/1,0 96 and commissioning of 4,5 MW condensing steam turbine for compressor drive, type specification K4,5 2,65 95 Planning, design, manufacture and commissioning of 11 MW condensing steam turbine with generator, heat exchanger and other accesories,type specification K 11,1-6,8 94 Planning, design, manufacture and commissioning of 12 MW condensing steam turbine with generator, heat exchanger and other accesories, type specification K12-0,78 93 Planning, design, manufacture and commissioning of 8,45 MW condensing steam turbine with generator, heat exchanger and other accesories, type specification T 8,45-6,5/0,6 KAZANCOMPRE SSORMASH Energo Future A6 Impex Mostostal EnergoPromCity Energetika Dwory Fabian-Vanko TENZA, Bučina Zvolen KAZANCOMPRE SSORMASH Energy Edge ZC,spol.s.r.o Teplárna České Budějovice Carthamus, Kazaň 2 Russia Swiadnov DEJ Rumunsko Romania Elblag Ekibastuz Kazachstan Dwory Badín Mydlovary Bučina Zvolen Kazaň 1 Russia Žarnovica České Budějovice Domoradice 1 2013 2 2012 2 2012 92 Planning, design, manufacture erection E.S.I.I.C cukrovar Qous 1 2010

Page 2 and commissioning of 6 MW backpressure steam turbine with generátor, type specification R6 2,3/0,3. 91 Planning, design, manufacture erection and commissioning of 6 MW backpressure steam turbine with generátor, type specification R6 2,3/0,3. 90 and commissioning of rotating reduction for boiler 0,7 MW 89 Planning, design, manufacture and commissioning of 20 MW condensing steam turbine with two controlled extractions, type specification PT 20-3,7/0,6/0,15. 88 Supply of two 8 MW backpressure steam turbines, type specification R8-4,5/0,3 87 Planning, design, manufacture and commissioning of 10 MW condensing steam turbine with generátor, heat exchanger and other accesories, type specification R 10,8-5,3/0,04-0,12. 86 Planning, design, manufacture and commissioning of 7,35 MW backpressure steam turbine with heat exchanger type specification R7,35-4,0/0,0439. 85 Modification of 12 MW condensing steam turbine generátor aimed at power increase by 1 MW, type specification P 12-4,1/1,1 84 Planning, design, manufacture and commissioning of 1,6 MW backpressure steam turbine, type specification R 1,6-3,0/0,8. 83 Retrofit of backpressure steam turbine with one controlled extraction, type specification R 36-11,5/0,6-E. 82 Planning, design, manufacture and commissioning of 5,6 MW condensing steam turbine with one controlled extraction, type specification T 5,6-3,8/0,3. 81 Planning, design, manufacture and commissioning of 10 MW condensing steam turbine, type specification T 10,5-1,0/0,25. 80 Planning, design, manufacture and commissioning of 8 MW backpressure steam turbine, type specification R 8-4,5/0,3E. 79 Planning, design, manufacture and commissioning of 6,5 MW condensing steam turbine, type specification K 6,5-5,2. 78 Delivery of 20,4 MW backpressure steam turbine including generátor, type specification R 20,4-9,0/0,6-E 77 Planning, design, manufacture and commissioning of 5,4 MW condensing steam turbine, type specification K 5,4-2,1. 76 Planning, design, manufacture and commissioning of 1,64 MW backpressure steam turbine, type specification R1,54- E.S.I.I.C. cukrovar Teplárna Dalkia Kolín, ACTHERM, s.r.o. Nile Sugar Copany Cairo EC Kielce PEC Dalkia Anwil Thajsko II Jitka Otín Tp Tábor Nobaria Sugar and Rafining company Borken HSFC Co. Ltd. Bangkok ADATO ADATO EDFU Kolín Chomutov 1 2010 1 2009 Alexandria 2 2007 Kielce Suwalki Elektrárna Kolín Wloclawek Bangkok Thailand Jindřichův Hradec Tábor Nobaria Borken Bangkok Thailand Banská Bystrica Banská Bystrica 1 2008 1 2008-2007 2 2006-2007

Page 3 6,3/2,3. 75 Revision and repair of 60 MW condensing PP 57-6,6/3,5/0,55. 74 Moderniztion of turbine, replacement of inlet extensions, reblading of some rows of 55 MW condensing steam turbine, type specification PP 55-13,0/3,5/0,5 73 Overhaul und reblading of 17 MW steam turbine type specification T17/17-1,8/0,12. 72 Planning, design, manufacture and commissioning of 1 MW backpressure steam turbine with gearbox for sugar mill, type specification TR 700 hsf. 71 Planning, design, manufacture and commissioning of backpressure steam turbine type specification R 6-2,3/0,3. 70 Planning, design, manufacture and commissioning of backpressure steam turbine, type specification ER 19,7-1,4/0,3 for generátor drive. 69 Supply of spare parts, modification, erection and commissioning of 33 MW steam turbine type specification PT 33-9,0/1,2/0,5. 68 Modernization, modification, and repair of 11 MW condensing steam turbine, type specification T 11/9,5-15,0/2,0 for blastfurnace compressor drive. 67 Overhaul and repair of 55 MW backpressure PR 55-13,0/3,5/0,5. 66 Overhaul and repair of 55 MW condensing 65 Update of hydraulic governing system in ŠKODA 110 MW steam turbine. uhelná, a. s. Energetika Třinec SI.I.C Cairo S.I.I.C. Cairo COLTERM Dinuinstal Škoda Power, s.r.o. ČKD Nové Energo, uhelná, a. s. a. s. ACETO Industries Třinec Abou-Kourkas Armant Timisoara Romania Dalkia Ostrava Czech Rrepublic Energetika Třinec KAFR EL DAWAR 64 Complete overhaul of 13 MW turbine. DALKIA ČR, a. s. Ostrava 63 Complete overhaul of R 25-9,0/1,0 steam turbine including new blading. 62 Repair of 44 MW condensing steam turbine. 61 Overhaul and repair of 55 MW condensing 60 Inspection of 5 MW condensing steam turbine. 59 Inspection and repair of 6 MW condensing P 6-4,0. 58 Overhaul of 12 MW steam turbine, type specification PR 12/7-5,4/0,8/0,12. 57 Planning, design, manufacture and commissioning of backpressure steam turbine, Teplárna České Budějovice Ško-Energo, a. s. uhelná, a. s. ZRE Katovice S.A. Vihorlat s.r.o. Martinská teplárenská, SES, a. s. Tlmače České Budějovice Mladá Boleslav Katovice Snina Martin Powerplant Starobreshevo /04

Page 4 type specification ER 5,5-13/1,4 for turbofeed pump drive, 200 MW unit powerplant Starobeshevo. 56 Repair of 44 MW condensing steam turbine. 55 Overhaul of 6 MW backpressure steam turbine, type specification R6-3,5. 54 Overhaul of 16 MW condensing steam turbine, type specification K 16,5-4,5. 53 Overhaul of 55 MW backpressure steam turbine, type specification PR 55-13,0/3,5/0,5. 52 Planning, design, manufacture, supply, commissioning of backpressure steam turbine with starting condenser, with controlled extraction, type specification PR 10,3-7,3/0,5-0,23E 51 Revision and repair of 6 MW backpressure PR 8,6-6,00/1,5/0,7. 50 Revision and repair of 60 MW condensing PP 57-6,6/3,5/0,55. 49 Revision and repair of 55 MW condensing 48 Planning, design, manufacture, delivery, comissioning of condensing steam turbine, type specification K 5-4. 9000min -1. Ško-Energo, a. s. ACTHERM Chomutov s.r.o. Chemopetrol Litvínov, Schering AG Cinergetika Ú/L uhelná, BKH Ukraine Mladá Boleslav Chomutov Litvínov Berlin Grossaitingen 47 Planning, design, manufacture, delivery, Kronospan Lampertswalde comissioning of condensing steam turbine, type specification K 5,5-3,1. 9000min -1 46 Overhaul of 12 MW condensing steam turbine with automatic double extraction, type specification PT 12-3,5/1,3/0,12. Actherm Chomutov Chomutov 45 Overhaul of 15 MW steam turbine. MEGATEM EC. Lublin Lublin 44 Revision and repair of 10 MW backpressure R 10-5,9/0,7. 43 Revision and repair of 9 MW condensing PP 9-3,7/1,1/0,4. 42 Revision and repair of 12 MW backpressure R 12-9,0/1,3. 41 Revision and repair of 25 MW backpressure R 25-13,0/1,3. 40 Revision and repair of 6 MW condensing steam turbine ŠKODA, type specification P 6-3,5/0,4. 39 Rekonstruction and reblading of 10 MW condensing T 9,8-1,8/0,12. 38 Project, design, manufacture, delivery, putting into operation of 5,6 MW, backpressure R 5,6-3,8/0,32 Slovenské cukrovary, a. s. Lovochemie, Žilinská teplárenská, a. s. Zvolenská teplárenská, a. s. Žďas, Energetika Třinec, MVA Sereď Lovosice Žilina Zvolen Žďár n/sázavou Třinec Bielefeld

Page 5 37 Project, design, manufacture, delivery, putting into operation of 560 kw, backpressure R 0,56-1,1/0,2. 36 Inspection and repair of 55 MW condensing 35 Inspection and repair of 60 MW condensing PP 57-6,6/3,5/0,55. 34 Planning, design and manufacture, delivery, commisioning of 4,5 MW backpressure R 4,5-2,2/0,3. 33 Turbine modification, modernization, power increase from 6 MW to 8,6 MW, turbine base plate modification, generátor replacement (biger output), type specification PR 8,6-6,0/1,5/0,7. 32 Overhaul and connection to the 25MW backpressure parent kontrol systém, type specification PR 25-9,0/1,5/0,7. 31 Turbine modernization, replacement of parts in turbine steam inlet section, reblading of some rows of 55MW turbine. Type specification 30 Planning, design and manufacture of condensing steam turbine with 14500/1500 gearbox, type specification K 1,6-2,0. 29 12 MW backpressure steam turbine modification and reblading, type specification R 12-3,6/0,25. 28 Planning, design, manufacture and delivery of 25 MW h.-p. stage for 30 MW condensing steam turbine, reblading of m.-p. and I.-p. stages. Power increase from 30 MW to 33 MW, type specification PT 33-9,0/1,0/0,12. 27 6 MW condensing steam turbine inspection and repair, type specification P 6-3,5/0,6 (ŠKODA). 26 10 MW backpressure steam turbine inspection and repair, type specification R 10-5,9/0,7. 25 32 MW backpressure steam turbine repair, turbine base plate modification. Type specification PR 32-9,0/0,8/0,17. 24 32 MW condensing steam turbine overhaul, oil system and control system modification - type specification T 32-6,95/0,25. 23 Overhaul of 6 MW backpressure steam turbine, reblanding, type specificaton R 6-3,5/0,6. 22 Overhaul and repair of 6 MW backpressure turbine, type specification R 6-3,5/0,5. Elektrárna Kolín, S.I.I.C. Cairo Cinergetika Ú/L Teplárna Otrokovice, LOBBE, Switzerland Moravskoslezské teplárny, Kaučuk, Vihorlat, Cukrovar NOVA, SSE š.p. Žilina, závod Tepláreň Martin Slovenské elektrárne, Povážské strojárne, - Energetika Vihorlat, Kolín Kous Ústí nad Labem Otrokovice Dąbrowa Górnicza Karviná Kralupy n/vltavou Snina Sereď Martin Nováky Povážská Bystrica Snina 21 PR 6,4-1,6/0,7 steam turbine repair.. Tp Bratislava Bratislava 20 General overhaul of PP 9-3,7/1,1/0,4 steam turbine. LOVOCHEMIE, a.s. Lovosice 1 1999 1 1999 1 1999

Page 6 19 Planning, design, manufacture, supply and comiisioning of P 12-4,1/1,1 condensing steam turbine with one controlled extraction, 12 MW output.. 18 Modification of D 7,5 turbines for feed water pump driving. 17 Modification and instrallation of Bergmann- Borsig turbine including piping, replacement of control system for WOODWARD systém. 16 Conversion of heating plant into power and heating plant. Supply and installation of steam turbine, step-down station and heat exchangers. 15 Modification of PR 25 steam turbine - HP part reblanding, replacement of control systém for WOODWARD systém, replacement of monitoring system for BENTLY NEVADA system. 14 General overhaul of MV 550 steam turbine. 13 Modification of ER/6-3,5/0,68 back-pressure steam turbine 12 General overhaul R1,5-3,5/0,35 steam turbine. 11 General overhaul R1,5-3,7/0,6 steam turbine. KUTNOHORSKÁ ELEKTRÁRNA POČERADY VYTOPNA FRÝDEK-MÍSTEK VYTOPNA FRÝDEK-MÍSTEK TEPLÁRNA OTROKOVICE, KARLOVARSKÁ TEPLÁRENSKÁ, OSTROVSKÁ TEPLÁRENSKÁ, SELIKO, OLŠANSKÉ PAPÍRNY, 10 EPR 4/4-3,9/1,1/0,4 steam turbine supply LOVOCHEMIE 9 EPR 2/2-3,6/1,1/0,4 steam turbine overhaul 8 PR 2,8/2,8-3,5/0,6/0,18 steam turbine overhaul. 7 Adjustment of 12,75/1,67 steam turbine control system. 6 Overhaul of nozzle segments and trial run of R16-12,75/1,67 steam turbine. HARMANECKÉ PAPIERNE, JITKA TEPLÁRNA TRMICE a.,s. SANBORN 5 General overhaul of K5-0,5 turbine. ČEZ, Elektrárny Poříčí 4 Technical assistance during R1,5/3,7/0,6 steam turbine overhaul. 3 Adjustment of R1,5-3,5/0,45 steam turbine control system. OLŠANSKÉ PAPÍRNY TONUS 2 R12-3,2/0,4 steam turbine repair. Tlaková plynárna 1 Repair of R1,5-3,5/0,35 steam turbine control system Seliko Kojetín Kolín Počerady Frýdek Místek Frýdek Místek Otrokovice Karlovy Vary Ostrov Kojetín Olšany Lovosice Harmanec Jindřichův Hradec Velké Meziříčí Teplárna Náchod Olšany Jaroměř Kojetín 1 1998 5 1998 1 1997 1 1997 1 1997 1 1994 1 1994 1 1994