REFERENCE LIST COMPANY SATER PROJEKT s.r.o.

Podobné dokumenty
REFERENCE LIST COMPANY SATER PROJEKT s.r.o.

REFERENČNÍ LISTINA SPOLEČNOSTI. SATER PROJEKT s.r.o.

B1 MORE THAN THE CITY

Kladenská továrna jak se stavěla

Project Life-Cycle Data Management

Petr Bednář managing director

Ready for your business

GUIDELINES FOR CONNECTION TO FTP SERVER TO TRANSFER PRINTING DATA

První brněnská strojírna Velká Bíteš, a.s. was founded in E.g. sales people, purchasing clerks, development workers, designers.

AIC ČESKÁ REPUBLIKA CZECH REPUBLIC

Varenská Office Centrum. Ostrava

Tento materiál byl vytvořen v rámci projektu Operačního programu Vzdělávání pro konkurenceschopnost.

Systém fasádní - Konstrukce VF50 a VF50RR. Hueck Hartmann

EDUCATION FOR THE ON-SITE WORKERS TOWARDS TO THE NEARLY ZERO ENERGY HOUSES

PROSPERITY Programme. OP Enterprise and Innovation. Klára Hanušová

Gymnázium a Střední odborná škola, Rokycany, Mládežníků 1115

Palmovka Business center Kancelářské prostory k pronájmu / Offices for lease. Na Žertvách 2247/29, Prague 8

HOTEL ZLI!ÍN A NEW PROJECT FOR SALE IN PRAGUE 5 ZLI!ÍN, CZECH REPUBLIC. ARCHITECT: ALFAVILLE, spol. s r.o. Ing.arch. Marek Todl

PLÁN NÁRODNÍCH PRACÍ NATIONAL WORK PROGRAMME

STUDY EDITS FOR BETTER TRANSPORT IN THE CENTRE OF NÁCHOD

VÚTS, a.s. Liberec CENTRE OF ENGINEERING RESEARCH AND DEVELOPMENT

TechoLED H A N D B O O K

Střední průmyslová škola strojnická Olomouc, tř.17. listopadu 49

Enabling Intelligent Buildings via Smart Sensor Network & Smart Lighting

OKMP. Souhrnná zpráva Společenství OKMP Annual Report OKMP corporation Mateřská společnost. Mother company. OKMP Group a.s.

Energy Saving Fund City of Litoměřice. Riga 25 th September 2015

Litosil - application

Značka FVE CZECH byla založena podnikateli a odborníky z oblasti využití sluneční energie pro výstavbu fotovoltaických elektráren.

VYSOKÁ ŠKOLA HOTELOVÁ V PRAZE 8, SPOL. S R. O.

Research infrastructure in the rhythm of BLUES. More time and money for entrepreneurs

Tabulka 1 Stav členské základny SK Praga Vysočany k roku 2015 Tabulka 2 Výše členských příspěvků v SK Praga Vysočany Tabulka 3 Přehled finanční

Klepnutím lze upravit styl Click to edit Master title style předlohy nadpisů.

LOCATION Koruna palace is situated in one of the most prestigious area of Prague central business district. The building is located

Role DSO v implementaci GDPR

The Military Technical Institute

AVENIR BUSINESS PARK. Radlická 714/113A, PRAGUE 5 KANCELÁŘSKÉ PROSTORY K PRONÁJMU / OFFICES FOR LEASE

Témata pro zpracování školních zkušebních úloh

Amazon Court KANCELÁŘE K PRONÁJMU OFFICES TO LET. RIVER CITY PRAGUE

USER'S MANUAL FAN MOTOR DRIVER FMD-02

Politické vzdělávání a podpora demokracie od roku Political Education and Democracy Support since 1999

Název školy STŘEDNÍ ODBORNÁ ŠKOLA a STŘEDNÍ ODBORNÉ UČILIŠTĚ, Česká Lípa, 28. října 2707, příspěvková organizace

Myšák Gallery. Vodičkova 710/31, Praha 1

Total area: km². Population: 10,2 mil. Currency: Czech crowns. The Capital: Prague

VŠEOBECNÁ TÉMATA PRO SOU Mgr. Dita Hejlová

ActiPack rozšířil výrobu i své prostory EMBAX Od ledna 2015 jsme vyrobili přes lahviček či kelímků. Děkujeme za Vaši důvěru!

User manual SŘHV Online WEB interface for CUSTOMERS June 2017 version 14 VÍTKOVICE STEEL, a.s. vitkovicesteel.com

Czech Republic. EDUCAnet. Střední odborná škola Pardubice, s.r.o.

REFERENČNÍ LISTINA SPOLEČNOSTI. SATER PROJEKT s.r.o.

místo, kde se rodí nápady

Presentations of Buy Smart

Rezidenční development o marketingu nově

AMBICÍ PROJEKTU NOVÁ ENVELOPA JE STÁT SE NOVOU MODERNÍ DOMINANTOU MĚSTA OLOMOUCE.

SGM. Smart Grid Management THE FUTURE FOR ENERGY-EFFICIENT SMART GRIDS

Střední průmyslová škola strojnická Olomouc, tř.17. listopadu 49

Transportation Problem

Executive office furniture system LINEART. Systém manažerského nábytku LINEART

LIST OF OFFERS AND REFERENCES

Contact person: Stanislav Bujnovský,

FACT SHEET Location Jungmannova 26/15, Prague 1, , CZ N, E

CZECH BUSINESS CLUB IN THE UAE 18 TH AUGUST 2014, PRAGUE

EXACT DS OFFICE. The best lens for office work

Administrativní a skladovací centrum Modletice Administrative and storage facilities Modletice. Crenel Business Park Modletice s.r.o.

AUDIT STATEMENT REPORT POSTSIGNUM ROOT QCA

Využití systémů geotermálního vytápění v ČR Overview of geothermal heating systems in the Czech Republic

PALÁC ANDĚL Kancelářské prostory k pronájmu / Offices for lease. Radlická 3185/1C, Prague 5

Water Planning in the Czech Republic

AMOSDESIGN CESTA K ÚSPĚCHU THE ROAD TO SUCCESS

Database systems. Normal forms

The Over-Head Cam (OHC) Valve Train Computer Model

Second WHO Global Forum on Medical Devices. Ing. Gleb Donin

FUTURAMA BUSINESS PARK

Zaměřen na rozvojové země Práce na rozvojových projektech, poznávání kultury, výuka angličtiny,

Ministerstvo školství, mládeže a tělovýchovy Karmelitská 7, Praha 1 tel.: msmt@msmt.cz

Drags imun. Innovations

ČSN EN ISO OPRAVA 2

INFORMAČNÍ CENTRUM REZIDENČNÍHO PARKU NA VACKOVĚ ALFAREZIDENCE

Profil skupiny EXTEC. The EXTEC GROUP Profile

CZ.1.07/1.5.00/

ITICA. SAP Školení přehled Seznam kurzů

České vysoké učení technické v Praze

Automatika na dávkování chemie automatic dosing

Varenská Office Centrum. Ostrava

Číslo projektu: CZ.1.07/1.5.00/ Název projektu: Inovace a individualizace výuky

COUNCIL OF THE EUROPEAN UNION. Brussels, 17 January /05 COPEN 9 EJN 1 EUROJUST 1

StandardLine DIMENSIONED SKETCH ROZMĚROVÁ ŘADA

Leitfaden für das Audit von Qualitätssicherungssystemen - Teil 1: Auditdurchführung

Inovace řízení a plánování činností s ohledem na požadavky ISO 9001

Tento materiál byl vytvořen v rámci projektu Operačního programu Vzdělávání pro konkurenceschopnost.

IS THERE NECESSARY TO RECALCULATE VLTAVA CASCADE PURPOSES??

Course description. Course credit prior to NO Counted into average NO Winter semester 0 / - 0 / - 0 / - Timetable Language of instruction

I. Produkce firmy a postavení v produkčním řetězci

N a b í d k a O f f e r

Property insurance services

1, Žáci dostanou 5 klíčových slov a snaží se na jejich základě odhadnout, o čem bude následující cvičení.

GENERAL INFORMATION RUČNÍ POHON MANUAL DRIVE MECHANISM

Bosch Group 2014bal network new and agile ways of working

STUDY EDITS MAIN ROADS IN ČESKÝ KRUMLOV

SUBSTRUCTURES underground structures

Co vím o Ázerbájdžánu?

Conference capacity and set out kapacity a uspořádání sálů

Transkript:

Page 1 (of 30) REFERENCE LIST COMPANY SATER PROJEKT s.r.o. Presentation, reference projects and realization of buildings the company The company SATER PROJEKT s.r.o. was established in June 1993 by the home company SUTER + SUTER Prague s.r.o. (as the direct representation of the Swiss firm SUTER + SUTER) and by two natural persons (Ing.arch. Leo Provaz a Ing. Zdeněk Dobiáš) as an independent company under the name SUTER + SUTER PROJEKT s.r.o. At the beginning of the year 1996, the Czech part of the firm SUTER + SUTER became independent and in the half of the same year, the name of the home firm was changed to SATER GROUP s.r.o. and the name of the designer s part in Kolín to SATER PROJEKT s.r.o. Since 1 September 2008, the engineering company SATER PROJEKT s.r.o. has been totally independent. It has taken place in Kolín and has continued in its activities with the same name, in the same quantity and with the same scope of employment but without any relationship with the company SATER GROUP in Prague. The Company has the liability insurance in respect to the consequences of professional errors in terms of its work, namely amounting to 15 mill. CZK. Amount could be as necessary clients increased up to 60 mill. CZK. In 2003, the company SATER PROJEKT, s.r.o., acquired the certificate No. 3009/14603/SMJ from ČSN EN ISO 9001:2001. The company continues to renew the certificate successfully as well as it satisfies necessary criteria of quality. Company currently has owncertificate ČSN EN ISO 9001:2009.

Page 2 (of 30) The trade turnover of the company amounts to approximately 50 to 60 mill. CZK / year. At present, the company supplies all kinds of orders in its region and the Czech Republic, and that is why it is one of the greatest and most powerfull engeneering companies. Since August 2002, the company has its own internet website where it is possible to find needed information and summary of all realized projects, including the photodocumentation of most noted buildings. Web address is: www.saterprojekt.cz The attached organizational chart gives a concrete idea of the general structure of the company SATER PROJEKT s.r.o.

Page 3 (of 30) Currently, the company has 35 employees and approximately 25 permanent external cooperators specialists. The employees are divided into professional groups according to the specialization. At the head of the abovementioned groups (departments) are their chiefs experts in their professions, members of the Republic Chamber of Engineers and Technicians Active in Construction and of the Czech

Page 4 (of 30) Chamber of Architects. At present, the total number of the authorized workers is 8. The activity of the Company consists in the ensurance of complete projects of housing, civil and industrial constructions from the architectonic studies to the asbuilt documentation including the interiors and solution of green areas, with a complete engineertechnical service, procurement of the planning and building permits as well as with the author s and technical supervision as far as to the final approval. The activity of the Company is extended by the preparation of statical opinions and fire evaluations of the objects. Profession composition of the Company is following: Building professions: documentation for planning permit procedure documentation for building permit procedure documentation for choice of supplier set of documentation documentation for execution of construction realization documentation shop and supplier s documentation as built documentation of the construction studies and investment plans build over studies of locations and territory generel development plans of factories and hospitals 3D visualizations solution of interiors solution of green areas solution of information and orientation systems concept, creation and model assemblaging Architecture: Structure (statics): projects of structures in reinforced concrete, both monolithic and precast ones projects of steel structures wooden structures in the division both classic, nailed and glued bricked structures of all kinds as for the type of objects both hall ones and storeyed skeletons statical calculations and dimensioning of building elements statical opinions and judgement of buildings defects Electroprofessions in the division: heavy current including transformer stations, high voltage electric wiring, outside lightening and standby supply measuring and regulation light current (communication systems as are: EPS, EZS, ACS, CCTV, structured cableway, ZR, ER etc.) Technical equipment of buildings: heating including boiler rooms using various fuels including heat pump ventilation and cooling systems including machinery rooms instrumentation and control sanitary installations (water, canalization, gas), watermain andcanalization connection branches as well as sewage

Page 5 (of 30) treatment plants compressed air distributions medicinal gases distributions working out fire safety solution and all levels documentation SHZ, SOZ (fixed fire extinguishing equipment, fixed airexhausting device) Engineering and control activity: consideration of documentations with public administration bodies and organizations and provision of the planning permits consideration of documentations with public administration bodies and organizations and provision of the building permits provision of documents and standpoints of public administration bodies and organizations necessary for the issuance of the planning and building permit. author's supervision on site technical supervision on site provision of the testing operation permit and provision of the support device apprehension, EIA documentation,sea documentation (Strategic Environmental Assessment), permit integrated (IPPC) final building approval The set of the abovecited activities is completed with workers specialized in preparation of budgets, plans of construction organization and with engineering activity, i.e. procurement of planning decisions and building permits including negotiations with the authorities concerned as well as with organizations and specialists in the field of antiradon measures and of fire protection. The professions not included in our Company are ensured, in the form of a permanent cooperation, from the side of other companies or specialists. The abovementioned concerns: technological parts of the constructions (technological units), ventilation and expertises of price estimations. The economic run, i.e. contractual relations, invoicing and other activities in conjunction with the running of businesses, is ensured by an independent department. Software equipement of the Company: The total number of the personal computers is 33. From that 25 graphics computer workstations. All the computers are interconnected along the internal computer network. The Company is equipped with three colour plotters A0 (accessible by the computer network), the colour computer printers A3, scanner A0 and a CD/DVD burners. The software equipment contains: AUTOCAD, NEMETSCHEK, COREL DRAW, WINDOWS, WORD, EXCEL or OFFICE The statical department uses the calculation programs: FIN EC, GEO 5 and ESA The personal computers have their laser printers on intranet network. Technical equipement: Besides the computer technology, the Company is equipped with a copying center of its own, namely both for large drawings with the help of Xerox 3050 and Xerox 6204 with colour scanner A0 as well as the normal text materials by Canon NP 6028 with an efficient digital copier Canon ir 3300. The Company is equipped also with basic instrument used for simple geodetic works (the level instrument Sokia with full equipement) and and by distance laser meter Hilti, used for real geodetic distance measurement of existing objects.

Page 6 (of 30) The company owns 5 cars which allows the stuff to reach the contructing buildings in the operative range and to provide all the engineering anctivities. Subsequently is a summary of selected realized buildings what are divided to separate groups according to individual types. OVERVIEW OF MAIN PROJECTS AND REALIZED BUILDINGS A buildings marked as a list form. picture are completed now and have processed annex with pictures as a catalog A buildings marked as a picture have processed annex with 3D visualization. A buildings marked as a have a processed an architectural model. 94 HOTEL "U KAŠNY" O 94 DISTRICT OFFICE IN KOLÍN O 95 Reconstruction of the object, project for the execution of construction. TECHNOCOM PRAHA O 96 Reconstruction of a house for an insurance company, documentation for building permit including procurement of permit and asbuilt documentation. AGROBANKA PRAGUE O 96 Documentation for building permit including procurement of permit and asbuilt documentation. BUILDING ON THE SQUARE IN KOLÍN 96 Interconnection of buildings of the Municipal Authority in Kolin asbuilt documentation. AGROBANKA KLADNO O 95 Reconstruction of a historical house in Kutna Hora in a hotel asbuilt documentation, realized partially. Establishment Caslav, documentation for building permit, documentation for execution of construction. DISTRICT OFFICE IN KOLÍN Reconstruction of a house B of the Municipal Authority in Kolin documentation for building permit and built documentation.

Page 7 (of 30) 98 SUPERMARKET REWE PENNY KOLÍN 98 KOMERČNÍ BANKA KOLÍN O2 99 01 Study, documentation for execution of construction including the author s supervision Documentation for planning procedure and for building permit. CONTROLTECH KOLÍN O 05 Study, documentation for building procedure, documentation for execution of construction including the author s supervision. ADDITIONAL BUILDING OF MALL DVOŘÁK II IN TÁBOR 05 New construction of the hypermarket including a roundabout, study, documentation for planning procedure, building permit and execution of construction. RECONSTRUCTION AND COMPLETION OF MULTI HOUSE IN PRAGUE 04 DISTRICT OFFICE IN KUTNÁ HORA A DISTRICT STATE ARCHIVES IN KUTNÁ HORA Reconstruction and additional construction of the building, documentation for planning procedure, building permit, execution of construction and the author s supervision. RYTÍŘSKÁ 6, PRAHA 1 03 Reconstruction of hall in the municipal authority. SUPERMARKET ALBERT KUTNÁ HORA O2 02 Study, documentation for building procedure, documentation for execution of construction including the author s supervision. DISTRICT OFFICE IN KOLÍN 01 Both the first and the second stage of the construction, study, documentation for building procedure, documentation for execution of construction including the author s supervision. RYTÍŘSKÁ 4, PRAHA 1 00 Study, documentation for building procedure. New constrution of administration building, building project, documentation for planning procedure, for building permit and execution of construction. INTERSPAR PARDUBICE S.K. NEUMANNA O Urban project for building of a department store, including examination of territorial capacity.

Page 8 (of 30) 05 DIANA MRÁZEK EKO MULTIFUNCTIONAL BUILDING IN KOLÍN O 06 RONAL JIČÍN O7 07 bude UNIVERSITY HOSPITAL ST. ANNA IN BRNO PARKING HOUSE O 10 Reconstruction of the facades and changing of the windows of the former brewery and part of the castle in Kolín documentation for building permit, selection of provider or onestage project including the static examination. UNIVERSITY HOSPITAL ST. ANNA IN BRNO PARKING AND HOTEL FACILITY O 09 Reconstruction of the vineyard house in PragueLibeň study, documentation for building permit, realization and the author s supervision. FACADE OF THE BREWERY AND PALACE IN KOLÍN O3 09 New building of the custom house documentation for realization. VINEYARD FARMHOUSE KUCHYŇKA O2 08 Additional building of the vineyard house in PragueLibeň study, documentation for planning procedure. FREE ZÓNA PARDUBICE STARÉ ČIVICE 08 Study, documentation for building permit and selection of provider. VINEYARD FARMHOUSE KUCHYŇKA O 08 Study, documentation for planning procedure, for building permit, execution of construction, author s supervision on solution new building of refuelling station. MODIFICATION OF PUBLIC AREAS IN HOSPITAL STREET IN SVITAVY O 08 New plant for shower bath production project documentation for area management, permission execution of construction and selection of provider. REFUELLING STATION SHELL IN KOLÍN 08 Testing study of building in the corner of the square Republiky. Preparation of architecturaldispositional study for a new parking house. VINEYARD FARMHOUSE KUCHYŇKA Documentation for permission execution and author`s supervision on solution on edbuilding estate in PragueLibeň 2009 realized in 2010

Page 9 (of 30) 12 NISA AIR SPOL. S R.O. O 13 IOCB CZECH ACADEMY OF SCIENCES O 13 Documentation for construction including author supervisors on the reconstruction and extension of the central part of the complex objects A and B and the construction of a garage for cars in Prague 6 1th phase, building B realized in 2014. IOCB CZECH ACADEMY OF SCIENCES O2 15 Study, documentation for planning procedure, building permission and building construction, including author`s supervisions for 1st phase (KFC, Shell petrol station, heliport etc..) realized in 2013 IOCB CZECH ACADEMY OF SCIENCES 14 Documentation for construction including author supervisors on the reconstruction and extension of the central part of the complex objects A and B and the construction of a garage for cars in Prague 6. DOBŠICE LOCALITY Z4 AT D11 HIGHWAY 14 Studies and documentation for planning permission on the heliport Mlada Boleslav. Documentation for construction including author supervisors on the reconstruction and extension of the central part of the complex objects A and B and the construction of a garage for cars in Prague 6 1th phase, building A, northeastern wing realized in 2014. TOWN KOLIN KOLIN CASTLE BUSINESS INCUBATOR Documentation for planning permission, for building permit and for construction including author's supervisors for reconstruction and completion of the fermenting room and burgrave house in the area of Kolin castle (documentation 20122013) realized in 2015. Catalog lists

Page 10 (of 30) 95

Page 11 (of 30) 96

Page 12 (of 30) 98

Page 13 (of 30) 98 O2

Page 14 (of 30) 99

Page 15 (of 30) 00

Page 16 (of 30) 01

Page 17 (of 30) 01 O2

Page 18 (of 30) 02

Page 19 (of 30) 03

Page 20 (of 30) 04

Page 21 (of 30) 07

Page 22 (of 30) 08

Page 23 (of 30) 08 O2

Page 24 (of 30) 08 O3

Page 25 (of 30) 10

Page 26 (of 30) 13

Page 27 (of 30) 14

Page 28 (of 30) 14 O2

Page 29 (of 30) 15

Page 30 (of 30) The above are a selection of construction of major projects and realized buildings as employees of the company worked out from 1993 to 2015. By the company management :...... Ing. arch. Leo Provaz Ing. Zdeněk Dobiáš Managing Director Managing Director Last actualization 20160526