Bosch boiler with pellet burner Pelet Brenn 2000

Rozměr: px
Začít zobrazení ze stránky:

Download "Bosch boiler with pellet burner Pelet Brenn 2000"

Transkript

1 Bosch boiler with pellet burner Pelet Brenn 2000 Bosch Termotechnika s.r.o. Krnov v PRAHA KRNOV MĚSTO ALBRECHTICE

2 Steel boiler with pellet burner Pelet Brenn kw Output 6 till 27 kw For installation with boiler from Bosch production: Dakon DOR F Buderus Logano S111-2 Junkers Supraclass S Bosch Solid 2000 B 2

3 Burner Pelet Brenn kw with solid fuel boiler High efficiency set of boiler and pellet burner Comfortable heat solution tank 195 l (140 kg) heating about 2-4 days w/o filling house about 100m 2, standard insulation Simple setting, easy operation and cleaning Room thermostat connection Suitable for boilers output 20 and 27 kw The most convenient way of heating with solid fuel Pellets wood, A1 by EN 303-5, DIN plus, EN ISO

4 Burner Pelet Brenn kw with solid fuel boiler Set for pellet heating Steel boiler from KrnP Pellet burner with control unit Conversion set for boilers 20,24 Conversion set for boilers 25Max/27, 32, 32D Fuel tank Fuel auger Door for burner installation Bricks of combustion space 4

5 Burner Pelet Brenn kw with solid fuel boiler Steel boiler from Bosch production Dakon DOR F Buderus Logano S111-2 Junkers Supraclass S Bosch Solid 2000 B High efficient vertical flue gas ways Easy cleaning from the top Good equipment included Boiler body from steel sheets EN JRG2 thickness 4-5 mm 5

6 Burner Pelet Brenn kw with solid fuel boiler Pellet burner Pelet Brenn kw, output 6 27 kw Easy and quick installation on boiler doors Electronic controller Automatic regulation of operation STB Time program Heat output setting by object size by heat energy Efficient combustion for all prescribed types of pellets 6

7 Burner Pelet Brenn kw with solid fuel boiler Fuel tank Volume 195 liters / 140 kg of pellets Easy and quick assembly from delivered parts Boiler operation for one filling 3 4 days house about 100 m 2 standard insulation Fuel feeding by auger from the tank bottom Complete emptying of the fuel from the tank 7

8 Burner Pelet Brenn kw with solid fuel boiler Pellet auger Auger principle of fuel feeding Automatic operation of feeding by output power Settable quantity of pellets by burner output Delivery max. 8,4 kg/hour, to set burner output power Adjusting the length of the connecting pipe so that the pellets freely distributed from the feeder to the burner Simple assembly 8

9 Burner Pelet Brenn kw with solid fuel boiler Burner controller ST-717 Separate control box, mounted to fuel tank Control of the fan, feeder, CH and DHW pump Safety thermostat STB Additional modules Output control Flow water sensor or room thermostat Error message on CU display Setting output power maximal temperature of flow water operation mode fan speed pellet volume week time program 9

10 Burner Pelet Brenn kw with solid fuel boiler Bricks in combustion space regulate the flow of flue gas in combustion space High temperature concrete easy installation wear parts Two sizes for boilers 20, 24 25Max/27, 32, 32D 10

11 Burner description 1. Burner body 2. Air channel 3. Internal wall 4. PCB 5. Internal feeder motor 6. Photocell 7. Fan 8. Burner tube 9. Burner holder 10.Grate 11.Internal auger 12.Burner wall 13.Heater 14.Pin 15.Cover 16.Bushing 17. Feeder temp. sensor 11

12 Technical data of boiler with pellet burner Parameter Unit DOR F/S111-2 with Pelet Brenn kw Boiler size Max/27 Nom. output with burner kw kw Min. output with burner kw kw Efficiency at nom. output % % Efficiency at min. output % % Fuel consumption Kg/h Kg/h 4,9 5,5 6,4 Boiler class

13 Technical data Parameter Unit Value Output power kw 13,4 34,1 Fuel consumption kg/h 2,9 7,2 Voltage V/Hz 230/50 El. shield protection - IP X0D Input power W 100 Input power of igniter W 300 Burner weight kg 11 Fuel tank volume ltr/kg 195/140 Pellet dimension (diam./length) mm 6/30 Requested chimney draught Pa 20 13

14 Device dimmension Boiler size A [mm] B [mm] Max/ D

15 Burner installation Unscrew the two screws on the bottom hinge and remove the ash door Remove the cotter pin of grate lever, disconnect lever and grate, remove grate lever Remove rotary grate and front grate 15

16 Burner installation Bricks for boiler size 20, 24 kw ( ) 16

17 Burner installation Bricks for boiler size 25Max/27, 32, 32D kw ( ) 17

18 Burner installation Insert ceramics bricks into the boiler 18

19 Burner installation Install and screw the door for the burner to the boiler Install the burner into door The tube for pellet input install to the burner depend on fuel storage tank position (better on right side from the boiler) 19

20 Burner installation Close the tertian air inlets by covers 20

21 Fuel tank assembly Assemble and set up the fuel tank next to the boiler (right / left) 21

22 Fuel tank assembly Auger tube insert into the tank through a seal ring at the lowest point of fuel tank Fill the tank by pellets 22

23 Burner assembly Fix the CU to front wall of the fuel tank Unscrew the cap under the flow water outlet of the boiler and install well ½" for temperature sensors Insert into the basin and fix temperature sensor STB sensor 23

24 Burner assembly To the burner terminal engage cable from CU 2, 3, 5 pole connectors Cable bushing fix to burner body 24

25 Connection of control unit El. supply Main switch Burner PE / N Buffer sensor bottom Buffer sensor top DHW sensor CH sensor Internal feeder Fan Heater Signal common. Feeder sensor Fan sensor Flame sensor STB 2x RS CH pump DHW pump Main feeder 25

26 Control unit ST-717 Control of boiler operation Fuel feedeing Combustion air Control CH pump DHW pump buffer Additional modules Mixing circuit module (up to 2) GSM module Internet module Roo thermostat Data communication RS On/Off 26

27 Control unit ST-717 Description Big graphic display with all necessary data Control by rotating switch By rotation select item or set value of parameter By pressing confirm selection or set Taste - Stand-by Exit leaving actual menu /item w/o change Actual version of SW ZPID STUB X99 ST-717NK 27

28 Control unit ST-717 function Basic display DHW operation mode, level of the fuel in storage tank Operation mode of the boiler Time, date, roomstat status Temperature of CH system actual requested Fan operation or Temperature of DHW actual requested Feeder run Fan output CH Pump Heater DHW pump 28

29 Control unit ST-717 operation modes Firing Activated by user Filling of the feeder and burner by fuel Ignition by hot air Active until flame is detected Operation Primary operation of the boiler Boiler works on nominal power to achieve requested boiler temperature Then switch to minimal power, the temperature should decrease If temperature decrease by hysterese, boiler switch to maximal power again If requested temperature is exceeded, boiler is switch to Damping mode 29

30 Control unit ST-717 operation modes Dumping Activation By user for boiler switch off At exceed of boiler temperature by 5 C External feeder stops, internal feeder works Fan is running to fuel burn out / flame fade Pump in operation Cleaning procedure by fan Pump are switch off at activation temperature In case of exceeding of boiler temperature start new ignition of the burner ater end of cleaning proces 30

31 Control unit ST-717 Main menu Screen Firing up Fuel tank full Requested boiler temperature Requested DHW temperature Manual operation Internal feeder feeders are off, only fan Parameters for maximal power Parameters for minimal power Week based control of boiler temperature Pump mode Installer settings Service settings Factory settings Software version 31

32 Control unit ST Screen Basic information about status of the boiler Valve statust (additional module is needed) Other screens are without sense for boiler and CU configuration 32

33 Control unit ST-717 Firing up Start by user Filling up of the feeder and burner by the fuel Ignition of the fuel by hot air Finish of this mode in detection of the flame by photo cell, switch to Operation mode Tray full After filling up of the fuel tank is performed this choice On basic screen is shown level of the fuel in tank. This level is calculated from feeder operation. At first the fuel tank has to be calibrated 33

34 Control unit ST-717 Temperatures of CH and DHW Temperature of flow water Requested temperature Setting is possible from basic screen Temperature of DHW Requested temperature od DHW 34

35 Control unit ST-717 Manual mode Feeder On/Off Internal feeder On/Off Fan On/Off Blow force Set of fan power 1 100% CH pump On/Off DHW pump On/Off Heater On/Off Valve 1, Valve 2 if mixing module is used Open / Close / Stop / Pump 35

36 Control unit ST-717 Max. / min. power Maximum power setting of burner parameters for nominal power Minimum power setting of burner parameters for minimal power (30%) Feed time Time of fuel feeding in seconds Feed interval Time when feeder is stop in seconds Feeding period summa of feed time and feed interval Blow force Fan output in % of maximum power Fan starts always on 100% power due to clear from the dust 36

37 Control unit ST-717 Weekly control Week-base regulation regulation of CH and DHW temperatures or/and damping mode every day/hour Daily cycle operation Boiler is damped in requested time Boiler week-based operation DHW week-based operation Temperatures are changed in requested time Mode 1 day /hour control of temperature Mode 1 setting Setting of damping time Setting of temperature change The time is necessary to set 37

38 Control unit ST-717 Pump modes Pump modes House heating DHW pump is off Water heat priority The DHW tank is charged if internal temperature is below requested Parallel pump In case of request to heat up of DHW tank is CH pump in operation as well Summer mode CH pump is off Buffer storage tank for CH water Buffer is charged by CH pump Pump start if Bottom temperature is below set Funkce horního čidla?? 38

39 Control unit ST-717 Installers menu Fitters menu setting of boilers parameters for system Boiler correction parameters of burner Ignition parameters for firing of the burner Ignition function -?? Minimum operation - behavior at req. temperature Tray full / Empty tray calibration of fuel tank Temperature settings Valve1, 2 setting of valve parameters Room regulator type and function of roomstat GSM module setting of GSM control Internet module setting of internet control Clock / Date setting of time Encoder sensitivity sensitivity of rotation switch Langue version set of communication language Display contrast setting of best display readability Factory settings reset of all parameters to factory values 39

40 Control unit ST Boiler Boiler modification of feeders and fan operation Fan coefficient Adjust of the fan speed for best combustion Feeder coefficient min. Feeder coefficient max. Optimal setting of fuel feeding based on caloric value of the fuel For minimal and maximal output 40

41 Control unit ST-717 Ignition parameters Ignition procedure Step 1 Blow-by fan is running for a specified period of time. Step 2 Initial fuel feeding feed for filling up of the burner Step 3 Heater Ignition of the fuel by hot air from the heater Photocell indicate flame in combustion space Step 4 Delay Stabilization of the flame 41

42 Control unit ST-717 Ignition parameters Ignition parameters Internal feeder delay Internal feeder is deactivated after the main feeder Fire sensor threshold Level of flame signal to detect flame end of step 3 Heater delay Max time for ignition detection of the flame Fan speed Fan output for ignition step 3 Fan speed delay Fan output for stabilization step 4 Firing up delay Duration of step 4 Duty time Feeder operation during step 4 Pause time Feeder pause during step 4 42

43 Control unit ST-717 Minimum operation Minimum operation Behavior of the boiler when boiler temperature reached requested value On Boiler is switched to Damp mode Off Boiler is switched to minimal output mode 43

44 Control unit ST-717 Fuel tank calibration Calibration of fuel tank Tray full calibration of fuel tank Before calibration is the tank filled and then carry out this option. Empty tray After consumption of the fuel from the tank this option is made CU now has information about the fuel consumption and can be calculated content of the fuel in the tank based on the operation of the feeder After new filling of the tank is made option Main menu -> Tray full The indication of the fuel amount in the tank appears on the main display or on the controller 44

45 Control unit ST-717 Temperature control Temperature settings Boiler hysteresis If temperature of boiler fall under requested by hysteresis value, boiler switch to maximal operation DHW hysteresis If DHW temperature fall under requested by hysteresis value, the DHW pump charge DHW tank Pump switch on temperature Minimal temperature of flow water when start both pumps 45

46 Control unit ST-717 Valve 1, 2 Registration Input of module number for relevant valve Valve status On/Off of the valve Valve setpoint temp Setting of requested temperature on the valve Opening time Maximum time for full valve opening Single stroke Max. value of valve opening change in case of the change requirement Minimal opening Minimal valve opening Valve type Floor heating mixing circuit Radiators mixing circuit 46

47 Control unit ST-717 Valve 1, 2 Equitherm regulation On/Off Parameters setting for equitherm regulation work. point 1 heating water temperature at outside temperature -20 C work. point 2 heating water temperature at outside temperature 0 C work. point 3 heating water temperature at outside temperature +20 C 47

48 Control unit ST-717 Valve 1, 2 Return inlet protection Protects boiler from to cold return water from heating system On/Off Minimal temperature of return water Maximal temperature of return water Additional sensors Sensors of return water and outside temperature are used from Own unit From second, main unit 48

49 Control unit ST-717 Valve 1, 2 Pump activation Condition of the switch on of valve pump Always sustain operation Never pump is stop Above threshold at min. temperature CH pump activation temp. set of temp. Factory settings Set of valve parameters to factory value Valve removal Valve cancellation 49

50 Control unit ST-717 Room regulator Room regulator On/Off Standard regulator On/Off TECH regulator Data regulator RS Room regulator device Off the room regulator is off CH boiler when the room temperature is reached, the boiler temperature is reduced CH pump when the room temperature is reached, the CH pump off 50

51 Control unit ST-717 Other settings GSM module On/Off of module for mobile control by SMS Internet module Setting of communication parameters Clock Setting of actual time Set date Setting of actual date Langue version Setting of communication language Display contrast Best readability of the display Factory settings Return to producer parameters values 51

52 Control unit ST-717 Service menu Service menu Setting of factory parameters for basic behavior of the boiler Relevant for safety of the boiler Access code 52

53 Control unit ST-717 Service menu Select PID Work Operation control Cleaning period Feeding time min Feeding time max Feeding interval min Feeding interval max Min. fan work Max fan work Fan speed min Fan speed max Power coef. Max Power coef. Min Ignition parameters Underpour time Internal feeder delay Fire sensor threshold Heater delay Fan speed Fan speed delay Duty time Pause time Damping parameters Damping delay Blow force Damping protection Min damping 53

54 Control unit ST-717 Service menu Temperature settings Max exhaust temperature Priority temperature CH pump emergency Anti-freeze temperature Boiler alarm temperature Fire sensor Fan Hall sensor Fan Code Fan min Fan max Fan speed min Fan speed max Growth impulses Lambda First lambda update time Update time Oxygen stroke Fan stroke Sum Min change Max change Lambda 100% Lambda 1% Min boiler temperature Flow Display contrast Factory settings 54

55 Control unit ST

56 Control unit ST

57 Burner operation setting For proper operation of the boiler with pellet burner recommended flue gas temperature C under pressure in the combustion chamber 12 Pa Required quality according to EN ISO A1 diameter 6mm, length 30 mm (DIN plus) Caloric value MJ/kg (4,2 5 kwh/kg) Filling the feeder by pellets Manual mode -> Feeder till auger is filled in by pellets Check delivery of pellets in hour by feeder manual mode Calculate Feeder time and Feeder interval for requested minimal and maximal output power Set fan power to best quality of combustion / emissions Content of CO 2 should be app. 15%, O 2 app. 5%, CO max. 300 ppm Set rest of parameters by central heating configuration 57

58 Flow water temperature [ C] Burner output [step] Boiler with pellet burner Burner operation Start procedure 80 C Step 4 Step 3 Step 2 Step 1 Full output Step 1 Step 2 Step 3 Full output Step 1 58

59 Flow water temperature [ C] Damp sequence Start sequence Fan output [%] Boiler with pellet burner Burner operation Minimum operation Off Achieving water temperature, burner switch to min power Achieving hysteresis, burner switch to max power Temp. don t decrease, burner switch to damp procedure Flame fade Start procedure 85 C 80 C 70 C 100% 50% 30% Max output Min output Feeder stop 59

60 Flow water temperature [ C] Damp sequence Start sequence Damp sequence Fan output [%] Boiler with pellet burner Burner operation Minimum operation On Achieving water temperature, burner switch to damp mode Flame fade Start procedure 80 C 70 C 100% 50% Feeder stop 30% Max output Boiler off 60

61 Flow water temperature [ C] Burner output [step] Boiler with pellet burner Burner operation Damp procedure 80 C Step 4 Step 3 Step 2 Step 1 Full output Step 1 Step 2 Step 3 Full output Step 1 61

62 Quality of pellets Quality of pellets is important pro reliable burner operation Requested quality by EN ISO A1 diameter 6mm, length 30 mm (C1 by EN 303-5), DIN plus heat content MJ/kg It is not allowed to use of vegetable pellets, grains, pellets with high bark content, etc. 62

63 Quality of pellets Production When processing wood there is also unusable waste This waste can be processed into pellets, without any chemical additives They are variously mixed finely ground sawdust and wood chips It is precisely defined moisture of the components The mixture is pressed through a circular form There is no need for chemical additives Lignin acts as a binder, is contained in the wood Such chipsticks of pellets are made 63

64 Quality of pellets 64

65 Quality of pellets the mark of quality Good Certification by DIN CERTCO program Certification Pelletsverbände (PVD, PVA) Certification by ÖNorm 7135 Certification by DIN Bad not certified pellets Attention, unknown volume of ash, corrosion risk! 65

66 Quality of pellets the mark of quality Good How can you recognize a good pellet? Ash content < 0,5-1% (DIN Plus < 0,3%) Lignin content is defined Max. moisture 10-20% v Diameter: 3-6 mm, length: 2-3 cm Made from quality wood Shiny, smooth surface No longitudinal or transverse cracks Low dust content at delivery The same size of pellets Clean water at the test Bad 66

67 Burner setting Delivery of pellets / Output power Control unit Max output Min output Fuel feeding Feeding pause Fan speed 67

68 Fuel delivery setting Amount of the fuel in kg per hour By manually operation of both feeders Boiler output = feeder time / feeding period * fuel amount * caloric value * boiler efficiency Sample of calculation Feeder time = 15 sec Feeder pause = 5 sec Feeding period = = 20 sec Amount of the fuel = 8,4 kg/hour Caloric value = 18 MJ/kg = 5,0 kwh/kg Fuel efficiency = 85% Boiler output = 15/20 * 8,4 * 5,0 * 0,85 = 26,8 kw Fan power by combustion quality CO 2 > 15%, O 2 < 5% 68

69 Before starting the burner Check the mounting of the burner to the boiler door, sealing of doors and other parts Connecting of the boiler to the chimney, combustion air inlet, filling the system with water Connecting of the fuel feeder, connecting of hose without bends, feeling of fuel tank Location and fixing temperature sensors in the basin Set the parameters according to the desired operating mode 69

70 Maintenance Regular cleaning of the burner Clean the grate from the ash or slag (lower quality pellets) Check the resistance of lighter (155 Ohm) Photocell control function (t20), position in burner body (lock) Clean dust from the pellets tank Burner adjustment using a combustion analyzer max. burner power for min. 10 minutes Setting O 2 to 5% (up to 10%) at high O 2 decrease fan power CO in range of ppm output power by fuel amount for lower levels correct fan parameters and amount of fuel 70

71 Alarm messages of CU Message Cause Solution CH sensor fault Boiler sensor faulty Change the boiler sensor DHW sensor falut DHW sensor faulty Change the DHW sensor Boiler temo. too high Too high boiler temperature Cool down and reset the boiler Mosfet temp. too high Fan capacitor faulty or wrong fan Check the fan connection to the burner Firing up alarm No fuel Refuel the fuel tank Check the feeder motors (int/ext) Photo cell faulty Check and replace photo cell Heather faulty Check and replace heather Hall sensor Hall sensor faulty Replace fan Fan faulty Replace fan STB Too high boiler temperature Cool down and reset the boiler STB faulty Replace STB C1 or C2 sensor fault Sensors C1 or C2 (additional Replace sensors pumps) faulty No 50Hz CU problem Replace CU No valve Wrong connection Check the connection communication Error by valve registration Register the valve again 71

72 Problem solving Code Failure Cause Solution A02 Parasitic flame signal Short cut of photoconductor Another light source Photoconductor change Removal this light source A03 STB open Boiler overheating Remove the cause of overheating, heating system, temperature setting A04 Safety feeder thermostat open Bad STB Ignition parameters are wrong clogged flue ways, chimney Bad safety feeder thermostat STB change Check the parameters t03, t04 Check the chimney draught remove of dirty Safety thermostat change 72

73 Problem solving Code Failure Cause Solution F02 Parasitic flame signal Flame signal is detected after end of operation request Post-ventilation finishing F05 Air sensor failure Blocked air sensor tube Check the tube F06 F10 Air sensor disconnected Flow ware sensor failure Bad fan Dirty fan wheel Cable interrupt Sensor damaged Short cut or interrupted sensor Change Clean, change Cable check, sensor change Change sensor Sensor and cable check, change 73

74 Comments For proper operation of the boiler with pellet burner must be inside of the boiler (combustion space, internal flue ways) vacuum. Therefore minimal chimney draught is 20 Pa Before equipment installing must be checked chimney. Setting of required chimney draft can be adjusted by draught regulator If chimney draft is insufficient (chimney can be blocked), safety feeder thermostat can be activated Starting boilers with pellet burner can be done by servicemen which were trained by manufacturer only, after all checks and inspection (flue gas ways) according to local regulations Operation is possible only in accordance with safety requirements, flue gas ways and other legal requirements The installation company that sells / installs equipment is required to ensure all the checks and inspections, educate customers on safe operation of the equipment and give him all the documents (manuals, protocols, review) 74

75 Thank you for attention Marek Lapiš KrnP/QMM-STI TT/SCZ-ASA Robert Bosch GmbH Všechna práva vyhrazena, také pro prípad dalšího používání, reprodukce,

Název společnosti: VPK, s.r.o. Vypracováno kým: Ing. Michal Troščak Telefon: Datum:

Název společnosti: VPK, s.r.o. Vypracováno kým: Ing. Michal Troščak Telefon: Datum: Pozice Počet Popis 1 ALPHA2 25-6 18 Výrobní č.: 9799321 AUTOADAPT function automatically finds the best setpoint and thus reduces the energy consumption and setup time. Insulating shells are supplied with

Více

Název společnosti: VPK, s.r.o. Vypracováno kým: Ing. Michal Troščak Telefon: Datum:

Název společnosti: VPK, s.r.o. Vypracováno kým: Ing. Michal Troščak Telefon: Datum: Pozice Počet Popis 1 SCALA2 3-45 A Datum: 2.7.217 Výrobní č.: 98562862 Grundfos SCALA2 is a fully integrated, self-priming, compact waterworks for pressure boosting in domestic applications. SCALA2 incorporates

Více

GUIDELINES FOR CONNECTION TO FTP SERVER TO TRANSFER PRINTING DATA

GUIDELINES FOR CONNECTION TO FTP SERVER TO TRANSFER PRINTING DATA GUIDELINES FOR CONNECTION TO FTP SERVER TO TRANSFER PRINTING DATA What is an FTP client and how to use it? FTP (File transport protocol) - A protocol used to transfer your printing data files to the MAFRAPRINT

Více

UPM3 Hybrid Návod na ovládání Čerpadlo UPM3 Hybrid 2-5 Instruction Manual UPM3 Hybrid Circulation Pump 6-9

UPM3 Hybrid Návod na ovládání Čerpadlo UPM3 Hybrid 2-5 Instruction Manual UPM3 Hybrid Circulation Pump 6-9 www.regulus.cz UPM3 Hybrid Návod na ovládání Čerpadlo UPM3 Hybrid 2-5 Instruction Manual UPM3 Hybrid Circulation Pump 6-9 CZ EN UPM3 Hybrid 1. Úvod V továrním nastavení čerpadla UPM3 Hybrid je profil PWM

Více

BERGAMO FIRENZE RIMINI. Samozavírače a samozavírací závěsy Floor springs and hinges

BERGAMO FIRENZE RIMINI. Samozavírače a samozavírací závěsy Floor springs and hinges 3 BERGAMO FIRENZE RIMINI Samozavírače a samozavírací závěsy Floor springs and hinges Bartosini s.r.o. Kancelář: Karvinská 1897, 737 01 Český Těšín tel.: +420 602 322 276; e-mail: bartosini@bartosini.cz

Více

Litosil - application

Litosil - application Litosil - application The series of Litosil is primarily determined for cut polished floors. The cut polished floors are supplied by some specialized firms which are fitted with the appropriate technical

Více

Název společnosti: VPK, s.r.o. Vypracováno kým: Ing. Michal Troščak Telefon: Datum:

Název společnosti: VPK, s.r.o. Vypracováno kým: Ing. Michal Troščak Telefon: Datum: Počet 1 SCALA2 3-45 A Datum: 2.7.217 Výrobní č.: 98562862 Grundfos SCALA2 is a fully integrated, self-priming, compact waterworks for pressure boosting in domestic applications. SCALA2 incorporates integrated

Více

Vypracováno: Telefon:

Vypracováno: Telefon: Počet Popis ALPHA2 25-8 8 Výrobní č.: 98649757 Pozn.: obr. výrobku se může lišit od skuteč. výrobku AUTOADAPT function automatically finds the best setpoint and thus reduces the energy consumption and

Více

SERVISNÍ MANUÁL PEGAS 250 E CEL OVO SERVICE MANUAL PEGAS 250 E CEL OVO

SERVISNÍ MANUÁL PEGAS 250 E CEL OVO SERVICE MANUAL PEGAS 250 E CEL OVO MG136-1 PEGAS 250 E CEL OVO SERVICE MANUAL page 1 SERVISNÍ MANUÁL PEGAS 250 E CEL OVO SERVICE MANUAL PEGAS 250 E CEL OVO 1. VAROVÁNÍ WARNING UPOZORNĚNÍ Pouze osoba splňující kvalifikaci danou zákonem je

Více

SERVICE MANUAL PEGAS 250 E CEL SERVISNÍ MANUÁL PEGAS 250 E CEL

SERVICE MANUAL PEGAS 250 E CEL SERVISNÍ MANUÁL PEGAS 250 E CEL MG-011-05 PEGAS 250 E CEL SERVICE MANUAL page 1 SERVISNÍ MANUÁL PEGAS 250 E CEL SERVICE MANUAL PEGAS 250 E CEL 1. VAROVÁNÍ WARNING UPOZORNĚNÍ Pouze osoba splňující kvalifikaci danou zákonem je oprávněna

Více

AUTOMATICKÝ DÁVKOVAČ Harvia. Návod na instalaci a použití instructions for installation and Use

AUTOMATICKÝ DÁVKOVAČ Harvia. Návod na instalaci a použití instructions for installation and Use AUTOMATICKÝ DÁVKOVAČ Harvia Návod na instalaci a použití instructions for installation and Use 15122011 CZ EN 1. OBECNÉ INFORMACE 1. GENEraL Účelem Harvia automatického dávkovače je aplikovat vodu a směs

Více

TechoLED H A N D B O O K

TechoLED H A N D B O O K TechoLED HANDBOOK Světelné panely TechoLED Úvod TechoLED LED světelné zdroje jsou moderním a perspektivním zdrojem světla se širokými možnostmi použití. Umožňují plnohodnotnou náhradu žárovek, zářivkových

Více

2N LiftIP. IO Extender. Communicator for Lifts. Version

2N LiftIP. IO Extender. Communicator for Lifts. Version 2N LiftIP Communicator for Lifts IO Extender Version 2.4.0 www.2n.cz Description The IO extender helps you extend 2N LiftIP with 1 input and 2 outputs. The purpose of the input is to cancel the rescue

Více

2N Voice Alarm Station

2N Voice Alarm Station 2N Voice Alarm Station 2N Lift1 Installation Manual Version 1.0.0 www.2n.cz EN Voice Alarm Station Description The 2N Voice Alarm Station extends the 2N Lift1/ 2N SingleTalk with an audio unit installed

Více

TECHNICKÝ LIST řada mechanických odvaděčů kondenzátu AUTODRAIN TECHNICAL DATA SHEET for mechanical autodrain equipment AUTODRAIN

TECHNICKÝ LIST řada mechanických odvaděčů kondenzátu AUTODRAIN TECHNICAL DATA SHEET for mechanical autodrain equipment AUTODRAIN Popis: Nádoba s mechanickým plovákem k odstraňování pevných nečistot, vody, aerosolů, uhlovodíků, prachu oddělených separátory KING AIR se systémem stlačeného vzduchu. Rozdělení dle využití instalace:

Více

USER'S MANUAL FAN MOTOR DRIVER FMD-02

USER'S MANUAL FAN MOTOR DRIVER FMD-02 USER'S MANUAL FAN MOTOR DRIVER FMD-02 IMPORTANT NOTE: Read this manual carefully before installing or operating your new air conditioning unit. Make sure to save this manual for future reference. FMD Module

Více

ROZM RY A P IPOJENÍ VÍ IVKY HYDROXEUR PEDI-JET

ROZM RY A P IPOJENÍ VÍ IVKY HYDROXEUR PEDI-JET DN FORMED Brno s.r.o. Hudcova 76a, 612 48 Brno Telefon: +420 541 321 095 Fax: +420 541 321 096 www.dnformed.cz dnformed@dnformed.cz len Asociace výrobc a dodavatel zdravotnických prost edk ROZM RY A P

Více

ADDRESS CONVERSION TABLE FOR MANUAL SETTING

ADDRESS CONVERSION TABLE FOR MANUAL SETTING - (06-57) - ADDRESS CVERSI TABLE FOR MANUAL SETTING In the case of a multiple refrigerant system, each refrigerant system should be set an exclusive refrigerant. Conversion table of refrigerant and rotary

Více

GENERAL INFORMATION RUČNÍ POHON MANUAL DRIVE MECHANISM

GENERAL INFORMATION RUČNÍ POHON MANUAL DRIVE MECHANISM KATALOG CATALOGUE RUČNÍ POHONY PRO VENKOVNÍ PŘÍSTROJE, MONTÁŽ NA BETONOVÉ SLOUPY MANUAL DRIVE MECHANISM FOR THE ACTUATION OF OUTDOOR TYPE SWITCHING DEVICES MOUNTED ON THE CONCRETE POLES TYP RPV ISO 9001:2009

Více

1-AYKY. Instalační kabely s Al jádrem. Standard TP-KK-133/01, PNE 347659-3. Konstrukce. Použití. Vlastnosti. Installation cables with Al conductor

1-AYKY. Instalační kabely s Al jádrem. Standard TP-KK-133/01, PNE 347659-3. Konstrukce. Použití. Vlastnosti. Installation cables with Al conductor Instalační kabely s Al jádrem Installation cables with Al conductor Standard TP-KK-133/01, PNE 347659-3 4 3 2 1 Konstrukce Construction 1 Hliníkové jádro Aluminium conductor 2 Izolace PVC 3 Výplňový obal

Více

11.12. 100 ΕΙΣΟΔΟΣ = E / ENTRANCE = E = = 1174 550 ΤΥΠΟΠΟΙΗΜΕΝΟ ΚΥ = 2000 (ΕΠΙΛΟΓΗ: 2100) / CH STANDARD = 2000 (OPTIONAL: 2100) 243 50 ΚΥ/CH + 293 ΚΥ/CH +103 100 ΚΥ /CH 6 11 6 20 100 0,25 ΚΑ (CO) + 45

Více

Mechanika Teplice, výrobní družstvo, závod Děčín TACHOGRAFY. Číslo Servisní Informace Mechanika: 5-2013

Mechanika Teplice, výrobní družstvo, závod Děčín TACHOGRAFY. Číslo Servisní Informace Mechanika: 5-2013 Mechanika Teplice, výrobní družstvo, závod Děčín TACHOGRAFY Servisní Informace Datum vydání: 20.2.2013 Určeno pro : AMS, registrované subj.pro montáž st.měř. Na základě SI VDO č./datum: Není Mechanika

Více

spa díly spa components jedineèná relaxace Swimmingpool Technology unique relaxation

spa díly spa components jedineèná relaxace Swimmingpool Technology unique relaxation spa díly spa components jedineèná relaxace unique relaxation Swimmingpool Technology Masážní èerpadlo "Sta-Rite" -"Sta-Rite" massage pump 0,7 0,55 Výkon m/h Capacity m/h 2 6 2-250 -25-252 0,75,0 27-25

Více

Size / Světlost : DN 1/4 to 4 / DN 1/4 až 4

Size / Světlost : DN 1/4 to 4 / DN 1/4 až 4 Size / Světlost : 1/4 to 4 / 1/4 až 4 Ends / Konce : Threaded BSP / Závitové BSP Min. Temperature / Minimální teplota : -20 C Max. Temperature / Maximální teplota : +180 C Max. Pressure / Maximální tlak

Více

:= = := :=.. := := := := ρ := := α := π α = α = := = :=

:= = := :=.. := := := := ρ := := α := π α = α = := = := := = := :=.. := := := := ρ := := α := π α = α = := = := := α := α := = := α := := α = = ρ ρ := := := = := = := := := + + := + + := + := := := := + + := + + := + = = = :=.. := η := η := := π = :=.. :=,

Více

If there is any inconsistency of weather forecast between Local Weather Station and this unit, the Local Weather Station's forecast should prevail. The trend pointer displayed on the LCD indicates the

Více

AIC ČESKÁ REPUBLIKA CZECH REPUBLIC

AIC ČESKÁ REPUBLIKA CZECH REPUBLIC ČESKÁ REPUBLIKA CZECH REPUBLIC ŘÍZENÍ LETOVÉHO PROVOZU ČR, s.p. Letecká informační služba AIR NAVIGATION SERVICES OF THE C.R. Aeronautical Information Service Navigační 787 252 61 Jeneč A 1/14 20 FEB +420

Více

Pokyny k použití. Model-300. Napájecí zdroj. Návod na obsluhu Operating Instructions. se systémem Aquacontrol Napájací zdroj

Pokyny k použití. Model-300. Napájecí zdroj. Návod na obsluhu Operating Instructions. se systémem Aquacontrol Napájací zdroj Pokyny k použití Model-300 Návod na obsluhu Operating Instructions Napájecí zdroj se systémem Napájací zdroj so systémom Power Supply with System BK 0011900 / PC AQUACONTROL Kryt aquacontrol Kryt aquacontrol

Více

AirKIT TECHNICKÝ MANUÁL. TnG-AirKIT. Power. Run

AirKIT TECHNICKÝ MANUÁL. TnG-AirKIT. Power. Run TnG-Air AirKIT + TnG-AirKIT - ok Power Run TECHNICKÝ MANUÁL 2. 1. ELEKTRICKÉ POPIS OVLÁDACÍCH ZAPOJENÍ PRVKŮ 1.1. AirKIT mod.2012 ovládací prvky 1 5 4 3 + TnG-AirKIT - Power ok Run 7 6 AirKIT ovládací

Více

Připojení internetového modulu econet300 Do regulátoru ecomax 810P3-L TOUCH.

Připojení internetového modulu econet300 Do regulátoru ecomax 810P3-L TOUCH. Připojení internetového modulu econet300 Do regulátoru ecomax 810P3-L TOUCH. Connection of econet300 internet module to ecomax 810P3-L TOUCH Controller. Prosím ověřte verzi softwaru vašeho modulu ecomax.

Více

Technická dokumentace. Komunikační modul Modbus s protokolem OpenTherm MM-OT101

Technická dokumentace. Komunikační modul Modbus s protokolem OpenTherm MM-OT101 Technická dokumentace Komunikační modul Modbus s protokolem OpenTherm MM-OT101 Obsah 1 Úvod... 2 2 Technické parametry... 3 2.1 Napájení... 3 2.2 RS485... 3 2.3 Opentherm... 3 2.4 Provozní a instalační

Více

RIMINI. Samozavírací hydraulické závěsy Self-closing hydraulic hinges

RIMINI. Samozavírací hydraulické závěsy Self-closing hydraulic hinges 3 RIMINI Samozavírací hydraulické závěsy Self-closing hydraulic hinges Bartosini s.r.o. Kancelář: Karvinská 1897, 737 01 Český Těšín tel.: +420 602 322 276; e-mail: bartosini@bartosini.cz WWW.BARTOSINI.CZ

Více

R40 Podklady pro projektování CZ_2012_07

R40 Podklady pro projektování CZ_2012_07 R40 Podklady pro projektování CZ_2012_07 2 Technický popis Technické údaje R40/50 R40/65 R40/85 R40/100 R40/120 R40/150 Jmenovitý tepelný výkon max./min. 80 / 60 C kw 45,8/7,6 60,8/10,1 81,1/13,4 92,9/15,6

Více

ZÓNOVÉ VENTILY S VRATNOU PRUŽINOU dvoucestné VZP 2XX 230 1P 001 třícestné VZP 3XX 230 1P 001

ZÓNOVÉ VENTILY S VRATNOU PRUŽINOU dvoucestné VZP 2XX 230 1P 001 třícestné VZP 3XX 230 1P 001 Návod na instalaci a použití ZÓNOVÉ VENTILY S VRATNOU PRUŽINOU dvoucestné VZP 2XX 230 1P 001 třícestné VZP 3XX 230 1P 001 CZ verze 1.2 Popis: Zónové ventily s vratnou pružinou jsou určeny do hydraulických

Více

TEPLOVODNÍ KRBOVÉ VLOŽKY HOT-WATER FIREPLACE INSERTS

TEPLOVODNÍ KRBOVÉ VLOŽKY HOT-WATER FIREPLACE INSERTS TEPLOVODNÍ KRBOVÉ VLOŽKY HOT-WATER FIREPLACE INSERTS www.hakr.cz All for Power of Fire! HAKR B 101 V21 7 11,5 kw 7 10 kw 14 21 kw Účinnost Efficiency HAKR B 102 V15 varianty / variants varianty / variants

Více

âistiã vzduchu / Air Cleaner MF 06, MF 08, MF 10 ada ASISTENT, velikost G 1/8, G 1/4, G 3/8 ASISTENT Series, G 1/8, G 1/4, G 3/8 Sizes

âistiã vzduchu / Air Cleaner MF 06, MF 08, MF 10 ada ASISTENT, velikost G 1/8, G 1/4, G 3/8 ASISTENT Series, G 1/8, G 1/4, G 3/8 Sizes âistiã vzduchu / Air Cleaner MF 06, MF 08, MF 10 ASISTENT Series, G 1/8, G 1/4, G 3/8 Sizes PouÏití pfiístroj na ãi tûní vzduchu a oddûlení vody (více neï 90 %) Use Device for air cleaning and water separation

Více

STEP-IN PURE. Barva vany 001: Bílá 4 až 5 mm sanitární akrylát, zesílený GFK. Rozměry v mm / ceny v bez DPH.

STEP-IN PURE. Barva vany 001: Bílá 4 až 5 mm sanitární akrylát, zesílený GFK. Rozměry v mm / ceny v bez DPH. STEP-IN PURE Modely Přehled Vana a sprchový kout v jednom Odnímatelná akrylátová dvířka Pohodlný vstup do sprchového prostoru Snadná obsluha Bezpečný odtokový systém s 2 opdady Moderní odtokový žlab v

Více

User manual SŘHV Online WEB interface for CUSTOMERS June 2017 version 14 VÍTKOVICE STEEL, a.s. vitkovicesteel.com

User manual SŘHV Online WEB interface for CUSTOMERS June 2017 version 14 VÍTKOVICE STEEL, a.s. vitkovicesteel.com 1/ 11 User manual SŘHV Online WEB interface for CUSTOMERS June 2017 version 14 2/ 11 Contents 1. MINIMUM SYSTEM REQUIREMENTS... 3 2. SŘHV ON-LINE WEB INTERFACE... 4 3. LOGGING INTO SŘHV... 4 4. CONTRACT

Více

NÁVOD K OBSLUZE KOMBINOVANÝ OBUVNICKÝ STROJ BT - 202

NÁVOD K OBSLUZE KOMBINOVANÝ OBUVNICKÝ STROJ BT - 202 NÁVOD K OBSLUZE KOMBINOVANÝ OBUVNICKÝ STROJ BT - 202 OBSAH I. Hlavní součásti obuvnického stroje. II. Konstrukce III. Schéma elektrického zapojení IV. Instalace a uvedení do provozu V. Obsluha stroje VI.

Více

SPARE PARTS EXPLODED VIEW COMMUNAL GAS BOILERS Model R 600. Communal Gas Boilers R 600. R EN - Edition 04-19/01/2011

SPARE PARTS EXPLODED VIEW COMMUNAL GAS BOILERS Model R 600. Communal Gas Boilers R 600. R EN - Edition 04-19/01/2011 SPARE PARTS EXPLODED VIEW COMMUNAL GAS BOILERS Model R 600 R8203198-04EN - Edition 04-19/01/2011 12082661 R601 Standard 04/08 12/10 12082672 R602 Standard 04/08 12/10 12082683 R603 Standard 04/08 12/10

Více

Katalog výrobků. Catalogue of products 2011. www.topmax.eu

Katalog výrobků. Catalogue of products 2011. www.topmax.eu Katalog výrobků atalogue of products 2011 www.topmax.eu L-PS - OR / L-PS type electric water heaters - round.... str. 6 L-PS - OR vodorovné / L-PS type electric water heaters - horizontal.... str. 8 L-PS

Více

INSTALAČNÍ NÁVOD OPERATING INSTRUCTION

INSTALAČNÍ NÁVOD OPERATING INSTRUCTION LED PRODISC II + LED PRODISC II MINI + LED PRODISC II MAXI INSTALAČNÍ NÁVOD OPERATING INSTRUCTION 4000944x 4000945x 4000940x 4000941x 4000946x 4000947x Prodisc II Mini Prodisc II Mini + MW senzor Prodisc

Více

Ventil zpětný Z15.1 DN 10 50, PN 100 400 Piston check valve Z15.1 DN 10 50, PN 100 400

Ventil zpětný Z15.1 DN 10 50, PN 100 400 Piston check valve Z15.1 DN 10 50, PN 100 400 DN 10 50, PN 100 400 DN 10 50, PN 100 400 Použití Zpětný ventil je samočinná armatura, zamezující zpětnému proudění provozní tekutiny, určená pro vodu, vodní páru, plyny i jiné provozní tekutiny používané

Více

SPECIFICATION FOR ALDER LED

SPECIFICATION FOR ALDER LED SPECIFICATION FOR ALDER LED MODEL:AS-D75xxyy-C2LZ-H1-E 1 / 13 Absolute Maximum Ratings (Ta = 25 C) Parameter Symbol Absolute maximum Rating Unit Peak Forward Current I FP 500 ma Forward Current(DC) IF

Více

ROLZ-2. Portable AV/Conference Center. Assembly Instructions

ROLZ-2. Portable AV/Conference Center. Assembly Instructions 1 ROLZ-2 Portable AV/Conference Center Assembly Instructions Rolz-2 Portable AV/Conference Center Part Drawing Description Qty Part Drawing Description Qty Hardware List A 1 ½ Flat Head Screw 2 EA P-1

Více

Quick Start Guide. Clear. Rychlý průvodce nastavením

Quick Start Guide. Clear. Rychlý průvodce nastavením CZ EN Quick Start Guide Clear Rychlý průvodce nastavením Measurement Měření Před Fully prvním charge použitím the blood plně pressure dobijte monitor baterii before přístroje. first use. 1 Rest your bare

Více

WL-5480USB. Quick Setup Guide

WL-5480USB. Quick Setup Guide Quick Setup Guide 1 Czech 7 Install Utility Software Note1: Before installing the utility software, DO NOT inserts the into your computer. If the adapter is inserted already, Windows will detect the adapter

Více

obal manuálu, asi něco podobného jako u LC 100 asi by to chtělo lepší obrázek!!! FYTOSCOPE FS130 Instruction Guide

obal manuálu, asi něco podobného jako u LC 100 asi by to chtělo lepší obrázek!!! FYTOSCOPE FS130 Instruction Guide obal manuálu, asi něco podobného jako u LC 100 asi by to chtělo lepší obrázek!!! FYTOSCOPE FS130 Instruction Guide možná tohle trochu zmenšit a dát sem i to varování LED RADIATION co je na další straně

Více

TECHNICKÝ LIST řada STANDARD, HP, FZ TECHNICAL DATA SHEET for STANDARD, HP, FZ 2018 v1.0

TECHNICKÝ LIST řada STANDARD, HP, FZ TECHNICAL DATA SHEET for STANDARD, HP, FZ 2018 v1.0 Popis: Separátory KingAir jsou určeny k odstraňování pevných nečistot, vody, aerosolů, uhlovodíků, pachů ze systému stlačeného vzduchu. Provedení zařízení umožňuje efektivní odstranění >99.9999% vody a

Více

Klepnutím lze upravit styl Click to edit Master title style předlohy nadpisů.

Klepnutím lze upravit styl Click to edit Master title style předlohy nadpisů. nadpisu. Case Study Environmental Controlling level Control Fifth level Implementation Policy and goals Organisation Documentation Information Mass and energy balances Analysis Planning of measures 1 1

Více

ELEKTROMOTORY SÉRIE CHT CHT ELECTRIC MOTORS

ELEKTROMOTORY SÉRIE CHT CHT ELECTRIC MOTORS ELEKTROMOTORY SÉRIE CHT CHT ELECTRIC MOTORS ÚVOD CHT série elektromotor byla vyvinuta pro p ipojení na p evodovky a z tohoto d vodu mají veškeré mechanické a elektrické charakteristiky p izp sobeny práv

Více

SERVISNÍ MANUÁL PEGAS 40 PLASMA PFC SERVICE MANUAL PEGAS 40 PLASMA PFC

SERVISNÍ MANUÁL PEGAS 40 PLASMA PFC SERVICE MANUAL PEGAS 40 PLASMA PFC MG-- PEGAS 0 PLASMA PFC SERVICE MANUAL page SERVISNÍ MANUÁL PEGAS 0 PLASMA PFC SERVICE MANUAL PEGAS 0 PLASMA PFC. VAROVÁNÍ WARNG UPOZORNĚNÍ Pouze osoba splňující kvalifikaci danou zákonem je oprávněna

Více

On-line datový list SAS4-F028P3PS2T00 SLG SPÍNACÍ SVĚTELNÉ MŘÍŽE PRO AUTOMATIZAČNÍ TECHNIKU

On-line datový list SAS4-F028P3PS2T00 SLG SPÍNACÍ SVĚTELNÉ MŘÍŽE PRO AUTOMATIZAČNÍ TECHNIKU On-line datový list SAS4-F08PPST00 SLG SAS4-F08PPST00 SLG A B C D E F H I J K L N O P R S T Technická data v detailu Vlastnosti Technologie Objednací informace Typ Výrobek č. SAS4-F08PPST00 077 další provedení

Více

Dehumidifiers Odvlhčovače Sirocco Dehumidifiers Sirocco Zodiac SET

Dehumidifiers Odvlhčovače Sirocco Dehumidifiers Sirocco Zodiac SET Odvlhčovače Dehumidifiers Odvlhčovače...................................... 202 Dehumidifiers...................................... 202 Odvlhčovače................................ 204 Dehumidifiers...............................

Více

2N LiftIP. Voice Alarm Station. Communicator for Lifts. Version

2N LiftIP. Voice Alarm Station. Communicator for Lifts. Version 2N LiftIP Communicator for Lifts Voice Alarm Station Version 2.4.0 www.2n.cz Description The 2N Voice Alarm Station is a switch that helps you extend 2N LiftIP with one or more audio units installed on

Více

Tento materiál byl vytvořen v rámci projektu Operačního programu Vzdělávání pro konkurenceschopnost.

Tento materiál byl vytvořen v rámci projektu Operačního programu Vzdělávání pro konkurenceschopnost. Tento materiál byl vytvořen v rámci projektu Operačního programu Vzdělávání pro konkurenceschopnost. Projekt MŠMT ČR Číslo projektu Název projektu školy Klíčová aktivita III/2 EU PENÍZE ŠKOLÁM CZ.1.07/1.4.00/21.2146

Více

Bezpečnostní odfukovací ventil Safety relief Valve SBV - Type 11

Bezpečnostní odfukovací ventil Safety relief Valve SBV - Type 11 Bezpečnostní odfukovací ventil Safety relief Valve SBV - Type 11 GmbH Akaziengasse 36, P.O.B.63, 1234 Vienna, AUSTRIA Tel.: +43 / 1 / 699 96 00 0 E-mail: brunnbauer@brunnbauer.at Fax.: +43 / 1 / 699 96

Více

LED PRODISC II SÉRIE

LED PRODISC II SÉRIE BEZPEČNÝ A UNIVERZÁLNÍ SAFE AND VERSATILE LED PRODISC II SÉRIE LED PRODISC II SERIES Účinné, úsporné a jasné osvětlení pro bezpečný průchod schodišť a chodeb. Volitelně k dispozici s nouzovou jednotkou

Více

INSTALLATION MANUAL PD 0027.01

INSTALLATION MANUAL PD 0027.01 INSTALLATION MANUAL PD 0027.01 OUTDOOR MOTOR DRIVE FOR MV DISCONNECTORS ISO 9001:2009 ISO 14001:2005 OHSAS 18001:2008 TYPE SUP a) STORAGE / SKLADOVÁNÍ The packed devices on wooden pallet it is not allowed

Více

Řetězový pohon pro otevírání a zavírání ven výklopných oken, kyvných oken, světlíků a dovnitř sklopných oken ze dřeva, PVC a hliníku.

Řetězový pohon pro otevírání a zavírání ven výklopných oken, kyvných oken, světlíků a dovnitř sklopných oken ze dřeva, PVC a hliníku. LIWIN Řetězový pohon pro otevírání a zavírání ven výklopných, kyvných, světlíků a dovnitř sklopných ze dřeva, PVC a hliníku. Chain actuator for opening and closing top-hung outward, shed, skylight and

Více

2N Helios Vario departure switch

2N Helios Vario departure switch Description 2N Helios Vario departure switch Order no. 9135251E The purpose of this module is to extend the 2N Helios Vario door communicator with another switch, e.g., for switching the electric door

Více

BERGAMO TD800. Podlahový samozavírač BERGAMO TD800 Floor spring BERGAMO TD800. BERGAMO Podlahové samozavírač I Floor spring

BERGAMO TD800. Podlahový samozavírač BERGAMO TD800 Floor spring BERGAMO TD800. BERGAMO Podlahové samozavírač I Floor spring BERGAMO TD800 Podlahový samozavírač BERGAMO TD800 Floor spring BERGAMO TD800 Nastavitelné ventily Adjustable valves 108 307 64 40 54 54 319 61 129 25 Samozavírač - bez aretace / Floor spring - without

Více

Název společnosti: VPK, s.r.o. Vypracováno kým: Ing. Michal Troščak Telefon: Datum:

Název společnosti: VPK, s.r.o. Vypracováno kým: Ing. Michal Troščak Telefon: Datum: Počet Popis 1 ALPHA1 L 25-4 18 Výrobní č.: 9916579 Pozn.: obr. výrobku se může lišit od skuteč. výrobku Grundfos ALPHA1 L 25-4 18 is a high-efficiency circulator pump with permanent-magnet motor (ECM technology).

Více

Introduction to MS Dynamics NAV

Introduction to MS Dynamics NAV Introduction to MS Dynamics NAV (Item Charges) Ing.J.Skorkovský,CSc. MASARYK UNIVERSITY BRNO, Czech Republic Faculty of economics and business administration Department of corporate economy Item Charges

Více

Project Life-Cycle Data Management

Project Life-Cycle Data Management Project Life-Cycle Data Management 1 Contend UJV Introduction Problem definition Input condition Proposed solution Reference Conclusion 2 UJV introduction Research, design and engineering company 1000

Více

GEKON 20, 25 kw. Emission class 5 acc. EN Hardened steel body 6 / 8 mm. Ecology and comfort heating. Universal burner. Efficiency up to 95 %

GEKON 20, 25 kw. Emission class 5 acc. EN Hardened steel body 6 / 8 mm. Ecology and comfort heating. Universal burner. Efficiency up to 95 % CZECH PRODUCER OF BOILERS THINK ECOLOGICALLY Advantages: Emission class 5 acc. EN 303-5 EKODESIGN Hardened steel body 6 / 8 mm Ecology and comfort heating Universal burner GEKON 20, 25 kw Automatic steel

Více

Nástrãné roubení - kovové / Socket Screw joints - Metallic ada BU 50000 / BU 50000 Series

Nástrãné roubení - kovové / Socket Screw joints - Metallic ada BU 50000 / BU 50000 Series Technické údaje / Technical data: Rozsah tlaku / Pressure range 0-1,5 MPa Rozsah teplot / Temperature range -18 C +70 C Pracovní poloha / Working position libovolná/any Pfiipojovací závit Válcov - s tûsnícím

Více

Melting the ash from biomass

Melting the ash from biomass Ing. Karla Kryštofová Rožnov pod Radhoštěm 2015 Introduction The research was conducted on the ashes of bark mulch, as representatives of biomass. Determining the influence of changes in the chemical composition

Více

INDUCTION HEATING CAPACITORS KONDENZÁTORY PRO INDUKČNÍ OHŘEV

INDUCTION HEATING CAPACITORS KONDENZÁTORY PRO INDUKČNÍ OHŘEV INDUCTION HEATING CAPACITORS KONDENZÁTORY PRO INDUKČNÍ OHŘEV SCA - 2012-1 CONTENTS OBSAH 03 General technical information Obecné technické informace 04 Medium Frequency Capacitors - water cooled, up to

Více

Šoupátko rychločinné A01 DN 125 350, Pp 4 20 MPa Quick acting gate valve A01 DN 125 350, Pp 4 20 MPa

Šoupátko rychločinné A01 DN 125 350, Pp 4 20 MPa Quick acting gate valve A01 DN 125 350, Pp 4 20 MPa DN 125 350, Pp 4 20 MPa DN 125 350, Pp 4 20 MPa Použití Rychločinná uzavírací armatura, určená pro radioaktivní vodu, vodní páru, plyny a všechny další provozní tekutiny, zejména primárních okruhů jaderných

Více

LED ROCKDISC II SÉRIE

LED ROCKDISC II SÉRIE ROBUSTNÍ A INTELIGENTNÍ ROBUST AND REFINED LED ROCKDISC II SÉRIE LED ROCKDISC II SERIES Moderní, vodotěsné osvětlení pro vnitřní i venkovní aplikace. Volitelně k dispozici s nouzovou funkcí a novým mikrovlnným

Více

Nástrãné roubení - kovové / Push-in Fittings ada BU 50000 / BU 50000 Series

Nástrãné roubení - kovové / Push-in Fittings ada BU 50000 / BU 50000 Series ada BU 50000 / BU 50000 Series Technické údaje / Technical data: Rozsah tlaku / Pressure range 0,099 1,5 MPa Rozsah teplot / Temperature range -20 C +80 C Pracovní poloha / Working position libovolná/any

Více

PROJEKČNÍ PODKLADY MONTÁŽNÍ NÁVOD

PROJEKČNÍ PODKLADY MONTÁŽNÍ NÁVOD N I V O L A I R Výrobek odpovídá normám EN a je označen značkou CE PROJEKČNÍ PODKLADY MONTÁŽNÍ NÁVOD SPIRÁLA hmotnost 26 kg NIVOLAIR - projekční podklady NIVOLAIR - výměník Spirála: Cu-trubka (žebrovaná)

Více

Gymnázium, Brno, Slovanské nám. 7 WORKBOOK. Mathematics. Teacher: Student:

Gymnázium, Brno, Slovanské nám. 7 WORKBOOK.   Mathematics. Teacher: Student: WORKBOOK Subject: Teacher: Student: Mathematics.... School year:../ Conic section The conic sections are the nondegenerate curves generated by the intersections of a plane with one or two nappes of a cone.

Více

Automatika na dávkování chemie automatic dosing

Automatika na dávkování chemie automatic dosing Automatika na dávkování chemie automatic dosing Swimmingpool Technology Autodos 700 Automatické dávkování Autodos Autodos automatic dosing Autodos 700 je jedno-kanálové zaøízení, pro mìøení a dávkování.

Více

Propaline. Propaline

Propaline. Propaline Propaline Propaline 78 OBSAH CONTENT Výrobky řady UNIVERSAL Products UNIVERSAL Výrobky řady LOMEN Products LOMEN Výrobky řady LOMAT Products LOMAT Výrobky řady EUROMAT Products EUROMAT Redukční ventily

Více

TECHNOLOGIE A EFEKTIVITA. Specialista na prádelenskou technologii od roku1922 Specialists in industrial laundry since 1922

TECHNOLOGIE A EFEKTIVITA. Specialista na prádelenskou technologii od roku1922 Specialists in industrial laundry since 1922 TECHNOLOGIE A EFEKTIVITA Specialista na prádelenskou technologii od roku1922 Specialists in industrial laundry since 1922 II PROFESSIONAL EQUIPMENT II 201 PROFESSIONAL EQUIPMENT Nová řada vysokoobrátkových

Více

2N Lift8 Audio unit machine room

2N Lift8 Audio unit machine room 2N Lift8 Audio unit machine room Brief Manual Version 3.0.0 www.2n.cz The machine room audio unit is intended for installation in the machine room or as an intercom solution located in the reception.

Více

1. ROZLIŠENÍ CS CU-05 a CS CU-05C

1. ROZLIŠENÍ CS CU-05 a CS CU-05C - 1 Evidenční číslo: MG 004-01 Stroj / podskupina: Vodní chlazení Počet stran: 6 Počet příloh: Kopie č.: Vypracoval: Pavel Mastný Kontroloval: Holý Schválil: Holý Podpis: Podpis: Podpis: Datum: 9.2.2009

Více

2N Lift8 Audio unit shaft

2N Lift8 Audio unit shaft 2N Lift8 Audio unit shaft Brief Manual Version 3.0.0 www.2n.cz This audio unit is designed for installation on the lift shaft bottom or lift cabin roof, or wherever it is necessary to communicate (during

Více

Instalační kabely s Cu jádrem

Instalační kabely s Cu jádrem Instalační kabely s Cu jádrem Installation cables with Cu conductor Standard: VDE 0276 T.603-3G-2 4 3 2 1 Konstrukce: Construction: 1 Měděné jádro Copper conductor 2 Izolace PVC 3 Výplňový obal 4 Plášť

Více

Buderus System Logatherm Wps K

Buderus System Logatherm Wps K Buderus System Logatherm Wps K XV1100K(C)/XV1100SK(C) All rights reserverd. Any reprinting or unauthorized use wihout the written permission of Buderus System Logatherm Wps K Corporation, is expressly

Více

PC/104, PC/104-Plus. 196 ept GmbH I Tel. +49 (0) / I Fax +49 (0) / I I

PC/104, PC/104-Plus. 196 ept GmbH I Tel. +49 (0) / I Fax +49 (0) / I  I E L E C T R O N I C C O N N E C T O R S 196 ept GmbH I Tel. +49 (0) 88 61 / 25 01 0 I Fax +49 (0) 88 61 / 55 07 I E-Mail sales@ept.de I www.ept.de Contents Introduction 198 Overview 199 The Standard 200

Více

3 Výplňový obal. 4 Plášť PE. Bedding

3 Výplňový obal. 4 Plášť PE. Bedding Instalační kabely s Cu jádrem Installation cables with Cu conductor Standard VDE0276 T.603-5G-2 4 3 2 1 Konstrukce Construction 1 Měděné jádro Copper conductor 2 Izolace XLPE XLPE insulation 3 Výplňový

Více

Enabling Intelligent Buildings via Smart Sensor Network & Smart Lighting

Enabling Intelligent Buildings via Smart Sensor Network & Smart Lighting Enabling Intelligent Buildings via Smart Sensor Network & Smart Lighting Petr Macháček PETALIT s.r.o. 1 What is Redwood. Sensor Network Motion Detection Space Utilization Real Estate Management 2 Building

Více

ROLZ-2. Portable AV/Conference Center. Assembly Instructions

ROLZ-2. Portable AV/Conference Center. Assembly Instructions 1 ROLZ-2 Portable AV/Conference Center Assembly Instructions Rolz-2 Portable AV/Conference Center Part Drawing Description Qty Part Drawing Description Qty Hardware List A 1 ½ Flat Head Screw 2 EA P-1

Více

Light (glass base with power cord and Ehmann dimmer, reflector, glass globe), light source, cotton gloves, installation manual

Light (glass base with power cord and Ehmann dimmer, reflector, glass globe), light source, cotton gloves, installation manual Package contents Name: BALLOONS PC858 Table light 607 850 Components included with unit: Light (glass base with power cord and Ehmann dimmer, reflector, glass globe), light source, cotton gloves, installation

Více

harvia griffin COLOUR LIGHT Control unit Ridici jednotka

harvia griffin COLOUR LIGHT Control unit Ridici jednotka harvia griffin COLOUR LIGHT Control unit Ridici jednotka 13082008 These instructions for installation and use are intended for owners of colour light units and control units and for electricians responsible

Více

4Ever H A N D B O O K

4Ever H A N D B O O K 4Ever HANDBOOK Kancelářský systém 4Ever Úvod Základními stavebními komponenty podnoží jsou bočnice a podélné nosníky. Bočnice je tvořena nohami čtvercového průřezu 45 x 45 mm, spojovacím vodorovným bočním

Více

Pozn.: obr. výrobku se může lišit od skuteč. výrobku

Pozn.: obr. výrobku se může lišit od skuteč. výrobku Počet Popis 1 MAGNA1 25- Pozn.: obr. výrobku se může lišit od skuteč. výrobku Výrobní č.: 99221217 The new MAGNA1 is the simple option for a job well done. It is the perfect choice when replacing older

Více

DC circuits with a single source

DC circuits with a single source Název projektu: utomatizace výrobních procesů ve strojírenství a řemeslech egistrační číslo: Z..07/..0/0.008 Příjemce: SPŠ strojnická a SOŠ profesora Švejcara Plzeň, Klatovská 09 Tento projekt je spolufinancován

Více

Návod na použití, montáž a údržbu Třícestný zónový kulový ventil s pohonem VZK 3xx - 230-1P - 001

Návod na použití, montáž a údržbu Třícestný zónový kulový ventil s pohonem VZK 3xx - 230-1P - 001 ávod na použití, montáž a údržbu Třícestný zónový kulový ventil s pohonem VZK 3xx - 230-1P - 001 CZ verze 1.0 1 POUŽITÍ Ventily s pohonem řady VZK 3xx - 230-1P mohou být použity ve spojení s jakýmkoliv

Více

topter AKTIVNÍ OCHRANA Leading Electrotechnology

topter AKTIVNÍ OCHRANA Leading Electrotechnology topter AKTIVNÍ OCHRANA Leading Electrotechnology topter Aktivní ochrana Průmyslové zásuvky IP44, IP66/IP67 P TECHNICKÉ PARAMETRY e shodě s normami EN 60309- IEC 60309- EN 60309-2 IEC 60309-2 EN 60529 IEC

Více

3 Výplňový obal. 4 Plášť PE. Bedding

3 Výplňový obal. 4 Plášť PE. Bedding Instalační kabely s Al jádrem Installation cables with Al conductor Standard VDE0276 T.603-5G-2 4 3 2 1 Konstrukce Construction 1 Hliníkové jádro Aluminium conductor 2 Izolace XLPE XLPE insulation 3 Výplňový

Více

Nástěnné jednotky Split Inverter / chlazení nebo topení

Nástěnné jednotky Split Inverter / chlazení nebo topení Nástěnné jednotky Split Inverter / chlazení nebo topení Výhody Technologie replace: bez problémů můžete použít stávající R22 vedení chladiva. DC inverterová technologie a ekologické chladivo R410A zajišťuje

Více

3 Výplňový obal. 4 Plášť PE. Bedding

3 Výplňový obal. 4 Plášť PE. Bedding Instalační kabely s Al jádrem Installation cables with Al conductor Standard TP-KK-145/03 4 3 2 1 Konstrukce Construction 1 Hliníkové jádro Aluminium conductor 2 Izolace XLPE XLPE insulation 3 Výplňový

Více

MAIN APPLICATIONS AIRCRAFT INDUSTRY POWER INDUSTRY TRANSPORTATION INDUSTRY MINING AND CHEMICAL INDUSTRY GENERAL INDUSTRY

MAIN APPLICATIONS AIRCRAFT INDUSTRY POWER INDUSTRY TRANSPORTATION INDUSTRY MINING AND CHEMICAL INDUSTRY GENERAL INDUSTRY MAIN APPLICATIONS AIRCRAFT INDUSTRY POWER INDUSTRY TRANSPORTATION INDUSTRY MINING AND CHEMICAL INDUSTRY GENERAL INDUSTRY 2 ISO 9001 BASIC TECHNICAL PARAMETERS 4 TABLE DIAMETER [MM] 800 1000 1250 1600 2000

Více

Czech Republic. EDUCAnet. Střední odborná škola Pardubice, s.r.o.

Czech Republic. EDUCAnet. Střední odborná škola Pardubice, s.r.o. Czech Republic EDUCAnet Střední odborná škola Pardubice, s.r.o. ACCESS TO MODERN TECHNOLOGIES Do modern technologies influence our behavior? Of course in positive and negative way as well Modern technologies

Více

MSZ-SF15VA MSZ-SF20VA

MSZ-SF15VA MSZ-SF20VA Multisplit Inverter / chlazení nebo topení Výhody K zajištění optimálního proudění vzduchu je možné nastavit jeden z pěti stupňů otáček ventilátoru. Pro velmi rychlé dosažení požadovaného mikroklima slouží

Více

ŘÍZENÍ FYZIKÁLNÍHO PROCESU POČÍTAČEM

ŘÍZENÍ FYZIKÁLNÍHO PROCESU POČÍTAČEM VYSOKÁ ŠKOLA CHEMICKO-TECHNOLOGICKÁ V PRAZE FAKULTA CHEMICKO-INŽENÝRSKÁ Ústav počítačové a řídicí techniky MODULÁRNÍ LABORATOŘE ŘÍZENÍ FYZIKÁLNÍHO PROCESU POČÍTAČEM Popis výukového systému Armfield PCT40A

Více